The China Mail - Boeing aims to lift MAX quality control at Renton factory

USD -
AED 3.672498
AFN 64.498896
ALL 80.819685
AMD 361.12818
ANG 1.789785
AOA 917.000381
ARS 1526.750902
AUD 1.423315
AWG 1.80125
AZN 1.699594
BAM 1.741787
BBD 2.015015
BDT 123.745402
BGN 1.747831
BHD 0.377604
BIF 3000.997453
BMD 1
BND 1.278059
BOB 11.730759
BRL 5.028301
BSD 1.000472
BTN 94.559477
BWP 13.70595
BYN 2.971479
BYR 19600
BZD 2.012094
CAD 1.406545
CDF 2315.999851
CHF 0.825725
CLF 0.024811
CLP 976.49913
CNY 6.67805
CNH 6.675525
COP 3192.79
CRC 455.529135
CUC 1
CUP 24.010794
CVE 98.199695
CZK 21.63385
DJF 178.150632
DKK 6.66144
DOP 61.440772
DZD 134.662028
EGP 54.377015
ERN 15
ETB 163.87083
EUR 0.89118
FJD 2.253802
FKP 0.747587
GBP 0.747345
GEL 2.590236
GGP 0.747587
GHS 11.660299
GIP 0.747587
GMD 73.499938
GNF 8854.987666
GTQ 7.645587
GYD 209.311853
HKD 7.84711
HNL 26.857072
HRK 6.713802
HTG 131.084908
HUF 325.705016
IDR 18036.35
ILS 3.088399
IMP 0.747587
INR 94.41245
IQD 1516.6493
IRR 1832374.999948
ISK 121.249953
JEP 0.747587
JMD 158.780625
JOD 0.708993
JPY 158.136498
KES 129.840126
KGS 87.450123
KHR 4068.146802
KMF 439.499662
KPW 899.999961
KRW 1327.950601
KWD 0.31022
KYD 0.833753
KZT 446.890557
LAK 22518.390538
LBP 89591.044298
LKR 332.14739
LRD 170.580744
LSL 16.412051
LTL 2.95274
LVL 0.60489
LYD 6.419294
MAD 9.819615
MDL 17.998442
MGA 4521.489767
MKD 54.903951
MMK 2099.21541
MNT 3597.533576
MOP 8.085932
MRU 40.128421
MUR 47.289758
MVR 15.460082
MWK 1734.751129
MXN 18.66087
MYR 4.081197
MZN 63.906631
NAD 16.412051
NGN 1332.149805
NIO 36.816372
NOK 9.37735
NPR 151.295341
NZD 1.757855
OMR 0.384502
PAB 1.000481
PEN 3.438421
PGK 4.479652
PHP 63.480996
PKR 276.89823
PLN 3.88389
PYG 5756.677086
QAR 3.647261
RON 4.759496
RSD 104.65099
RUB 81.825408
RWF 1478.615162
SAR 3.748965
SBD 8.07458
SCR 13.83198
SDG 601.509134
SEK 9.90143
SGD 1.27805
SHP 0.7473
SLE 23.919955
SLL 20969.504398
SOS 571.749178
SRD 37.661506
STD 20697.981008
STN 21.819089
SVC 8.754392
SYP 13001.999685
SZL 16.418788
THB 33.614498
TJS 9.214157
TMT 3.51
TND 2.986543
TOP 2.40776
TRY 49.602797
TTD 6.792416
TWD 32.423502
TZS 2644.999727
UAH 45.047334
UGX 4207.076509
UYU 40.164934
UZS 11975.562621
VES 879.788903
VND 25856.5
VUV 119.136032
WST 2.774679
XAF 584.575977
XAG 0.017399
XAU 0.000242255985
XCD 2.702551
XCG 1.803058
XDR 0.707052
XOF 584.575977
XPF 106.20998
YER 236.103383
ZAR 16.397965
ZMK 9001.203567
ZMW 20.069287
ZWL 321.999592
SSP 5787.554334
MXV 2.106372
  • RYCEF

    0.4000

    19.71

    +2.03%

  • CMSC

    0.0000

    20.4

    0%

  • BTI

    0.4200

    56.05

    +0.75%

  • BP

    0.2800

    44.43

    +0.63%

  • RBGPF

    1.6000

    67

    +2.39%

  • RIO

    -0.1500

    94.41

    -0.16%

  • AZN

    -0.4300

    166.15

    -0.26%

  • GSK

    0.4600

    49.7

    +0.93%

  • BCE

    -0.4100

    20.56

    -1.99%

  • NGG

    -0.2500

    75.24

    -0.33%

  • VOD

    -0.0400

    16.58

    -0.24%

  • RELX

    -0.4500

    33.07

    -1.36%

  • BCC

    -0.5500

    76.59

    -0.72%

  • CMSD

    -0.0300

    20.27

    -0.15%

  • JRI

    -0.2500

    10.77

    -2.32%

Boeing aims to lift MAX quality control at Renton factory
Boeing aims to lift MAX quality control at Renton factory / Photo: © POOL/AFP

Boeing aims to lift MAX quality control at Renton factory

At its plane factory near Seattle, Boeing has increased employee training, appointed mentors for new recruits, brought back retirees as coaches and stepped up tracking of performance metrics.

Text size:

It's all part of an effort to strengthen quality control on the 737 MAX, a bestselling airliner that has suffered some high-profile problems.

Boeing this week led a tour for reporters at its manufacturing facility in Renton, Washington to see what the company is doing to rebuild confidence and hear from employees on the front line.

"I am extremely confident that every plane leaving this plant is safe," said Elizabeth Lund, a senior vice president for quality at Boeing.

The manufacturer has been under a microscope by regulators at the Federal Aviation Administration following a near-disastrous Alaska Airlines flight in January when a 737 MAX had to make an emergency landing after a fuselage panel blew out mid-flight.

An FAA audit following the incident pointed to compliance problems in Boeing's processes control, parts handling and storage, one factor in the FAA order limiting MAX output.

The agency plans to closely monitor Boeing's implementation of a safety "roadmap" required by the FAA after the Alaska flight.

Lund described four categories of actions Boeing is taking to address systemic issues: investing in workforce training; simplifying plans and processes; eliminating defects; and elevating safety and quality culture.

"We are getting stronger," she said, adding that fully upgrading the operation will take a few years.

Boeing deployed Bill Riley, a 16-year quality inspector, to Spirit AeroSystems' factory in Kansas where fuselages are built for the 737.

"I went to Spirit to teach them what I know here, and learn from them there," Riley said. "And you do see changes on the fuselages we receive here."

Such "face-to-face" meetings lead to a more seamless operation, he said.

- Post-pandemic training blitz -

Since January, some 150 Boeing employees have been assigned to Spirit's Wichita operation, a major increase from before, said Katie Ringgold, vice president and general manager for the 737 program.

The result has been a "significant reduction in the defects on fuselages in just three months," said Ringgold.

The shift has also improved efficiency, resulting in more than a 50 percent drop in late tasks.

These improvements will help Boeing as the company implements improvements throughout its three assembly lines, which are split into 10 stations.

In one change currently underway, workers must check at each station whether the operation has met key criteria before it can pass to the next station.

At first glance, the Renton factory operation seems chaotic, with a succession of planes at various stages of assembly.

But staff scrutinize the details -- reporting if a piece is wrongly detached, or defective in some way. Since the January incident, barcode tracking has been introduced in some cases, overseen by a steward.

Around 300 to 500 people work on each assembly line against a steady industrial buzz.

Nearby sits a training center where new recruits learn the ropes as mechanics and quality inspectors.

The company has added more than 300 hours of supplementary training since the pandemic, which saw a turnover of tens of thousands of workers replaced by newcomers.

New recruits need about four months before they can work on the assembly plant's shop floor.

Boeing engineers also have undertaken training even if it isn't always required, said Mani Tiggs, vice president for manufacturing and safety at Boeing's commercial plane business.

In all, about 600 people frequent the training center each day.

The idea behind the training is to simulate actual factory operations as closely as possible, said Tiggs, adding that the operation has about 160 workplace coaches who guide staff.

A 737 MAX is composed of more than two million components, including around 40,000 rivets that are installed one by one, a process that can sometimes involve more than one person. The MAX also includes some 36 miles (58 kilometers) of cable.

And if one piece "falls on the floor, we don't use it anymore," said one instructor. "It goes in the FOD box," which stands for foreign object debris.

B.Carter--ThChM