The China Mail - Fuel leak delays preparations for NASA rocket launch

USD -
AED 3.672502
AFN 63.999692
ALL 81.442168
AMD 361.356205
ANG 1.789785
AOA 918.000238
ARS 1531.580988
AUD 1.424299
AWG 1.8025
AZN 1.719283
BAM 1.751936
BBD 2.019841
BDT 124.502291
BGN 1.747831
BHD 0.378636
BIF 3009.562199
BMD 1
BND 1.2812
BOB 12.160165
BRL 5.437703
BSD 1.002889
BTN 95.171425
BWP 13.855559
BYN 2.954181
BYR 19600
BZD 2.016885
CAD 1.39796
CDF 2315.000088
CHF 0.82319
CLF 0.025248
CLP 993.709674
CNY 6.661101
CNH 6.64394
COP 3218.67
CRC 456.02956
CUC 1
CUP 24.068509
CVE 98.772786
CZK 21.781998
DJF 178.577987
DKK 6.681965
DOP 60.786026
DZD 135.75098
EGP 55.859529
ERN 15
ETB 161.902139
EUR 0.89406
FJD 2.243701
FKP 0.746765
GBP 0.746245
GEL 2.600526
GGP 0.746765
GHS 11.683612
GIP 0.746765
GMD 74.000185
GNF 8876.049714
GTQ 7.66695
GYD 210.211851
HKD 7.845765
HNL 26.9551
HRK 6.76901
HTG 131.391307
HUF 327.051007
IDR 18160
ILS 3.13695
IMP 0.746765
INR 94.83495
IQD 1520.31173
IRR 1868415.000232
ISK 121.589852
JEP 0.746765
JMD 159.364013
JOD 0.708976
JPY 157.774983
KES 129.939796
KGS 87.448701
KHR 4091.870006
KMF 440.999742
KPW 899.999961
KRW 1340.915017
KWD 0.31117
KYD 0.835759
KZT 454.722981
LAK 22579.734941
LBP 89806.69145
LKR 333.576685
LRD 170.480349
LSL 16.713128
LTL 2.95274
LVL 0.60489
LYD 6.446758
MAD 9.860886
MDL 17.951359
MGA 4536.110178
MKD 55.157433
MMK 2099.693878
MNT 3599.326016
MOP 8.10391
MRU 40.665547
MUR 47.289736
MVR 15.449853
MWK 1738.573508
MXN 18.768035
MYR 4.067403
MZN 63.909996
NAD 16.713053
NGN 1344.520036
NIO 36.905162
NOK 9.212103
NPR 152.274101
NZD 1.78001
OMR 0.384271
PAB 1.003001
PEN 3.471087
PGK 4.563879
PHP 63.603969
PKR 277.436793
PLN 3.94685
PYG 5875.265928
QAR 3.655843
RON 4.7733
RSD 105.271644
RUB 80.624757
RWF 1480.416527
SAR 3.764539
SBD 8.058206
SCR 14.712529
SDG 601.505413
SEK 9.799205
SGD 1.278509
SHP 0.748335
SLE 22.864817
SLL 20969.504398
SOS 573.104915
SRD 37.619501
STD 20697.981008
STN 21.946031
SVC 8.775026
SYP 13001.999685
SZL 16.707648
THB 33.777496
TJS 9.231424
TMT 3.5
TND 2.999059
TOP 2.40776
TRY 49.970498
TTD 6.799808
TWD 32.585
TZS 2642.997972
UAH 45.485612
UGX 4262.104179
UYU 40.318896
UZS 12028.32407
VES 887.479801
VND 25791
VUV 118.915185
WST 2.776217
XAF 586.465001
XAG 0.019887
XAU 0.000255428494
XCD 2.70255
XCG 1.807408
XDR 0.707052
XOF 586.465001
XPF 106.82886
YER 236.195061
ZAR 16.68449
ZMK 9001.199662
ZMW 20.222595
ZWL 321.999592
SSP 5745.217636
MXV 2.113638
  • RYCEF

    0.4000

    19.71

    +2.03%

  • CMSC

    0.0000

    20.4

    0%

  • BTI

    0.4200

    56.05

    +0.75%

  • BP

    0.2800

    44.43

    +0.63%

  • RBGPF

    1.6000

    67

    +2.39%

  • RIO

    -0.1500

    94.41

    -0.16%

  • AZN

    -0.4300

    166.15

    -0.26%

  • GSK

    0.4600

    49.7

    +0.93%

  • BCE

    -0.4100

    20.56

    -1.99%

  • NGG

    -0.2500

    75.24

    -0.33%

  • VOD

    -0.0400

    16.58

    -0.24%

  • RELX

    -0.4500

    33.07

    -1.36%

  • BCC

    -0.5500

    76.59

    -0.72%

  • CMSD

    -0.0300

    20.27

    -0.15%

  • JRI

    -0.2500

    10.77

    -2.32%

Fuel leak delays preparations for NASA rocket launch
Fuel leak delays preparations for NASA rocket launch / Photo: © AFP

Fuel leak delays preparations for NASA rocket launch

As NASA on Saturday resumed its second effort to get its new 30-story rocket off the ground and send its uncrewed test capsule toward the Moon, engineers detected a fuel leak that potentially could lead to a new delay.

Text size:

With millions around the globe and hundreds of thousands on nearby beaches waiting for the historic launch of the massive Space Launch System (SLS), a leak near the base of the rocket was found as ultra-cold liquid hydrogen was being pumped in.

NASA said engineers would "stop flowing liquid hydrogen to the tank, close the valve used to fill and drain it," then try to reseal it.

The space agency offered no information on the likelihood of a new delay in the Artemis program -- which aims eventually to return a human crew to the Moon -- following Monday's aborted effort.

Saturday's launch is still scheduled for 2:17 pm (1817 GMT) from Kennedy Space Center in Florida. It can be delayed by up to two hours if necessary.

"Our team is ready," Jeremy Parsons, deputy manager of exploration ground systems at Kennedy Space Center, had said Friday.

"They are getting better with every attempt and actually performed superbly during launch countdown number one... I think if the conditions with weather and the hardware align, we'll absolutely go."

Though the area around the launch site will be closed to the public, an estimated 400,000 people were gathering on beaches nearby to see -- and hear -- the most powerful vehicle that NASA has ever launched climb into space.

The initial launch attempt was halted after engineers detected a fuel leak and a sensor showed that one of the rocket's four main engines was too hot.

Both issues have since been resolved, the launch team said.

Shortly before 06:00 am (1000 GMT) Saturday, launch director Charlie Blackwell-Thompson had given the go-ahead to start filling the rocket's tanks with cryogenic fuel.

About three million liters of ultra-cold liquid hydrogen and oxygen was expected to be pumped into the spacecraft.

And the weather appeared to be cooperating: the US Space Force predicts a 60 percent chance of favorable weather at the scheduled liftoff time, growing to 80 percent later in the launch window.

If something requires NASA to stand down again on Saturday, there are backup opportunities on Monday or Tuesday. After that, the next launch window will not be until September 19, due to the Moon's position.

The purpose of the Artemis 1 mission is to verify that the Orion capsule, which sits atop the SLS rocket, is safe to carry astronauts in the future.

Mannequins equipped with sensors are standing in for astronauts on the mission and will record acceleration, vibration and radiation levels.

- Apollo's twin sister -

It will take several days for the spacecraft to reach the Moon, flying around 60 miles (100 kilometers) at its closest approach. The capsule will fire its engines to get to a distant retrograde orbit (DRO) of 40,000 miles beyond the Moon, a record for a spacecraft rated to carry humans.

The trip is expected to last around six weeks and one of its main objectives is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built.

On its return to Earth's atmosphere, the heat shield will have to withstand speeds of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius) -- roughly half as hot as the Sun.

Artemis is named after the twin sister of the Greek god Apollo, after whom the first Moon missions were named.

Unlike the Apollo missions, which sent only white men to the Moon between 1969 and 1972, Artemis missions will see the first person of color and the first woman step foot on the lunar surface.

Fittingly, NASA's first woman launch director, Blackwell-Thompson, will give the final "go" for liftoff on Saturday.

A successful Artemis 1 mission will come as a huge relief to the US space agency, after years of delays and cost overruns.

A government audit estimates the program's cost will grow to $93 billion by 2025, with each of its first four missions clocking in at a whopping $4.1 billion per launch.

The next mission, Artemis 2, will take astronauts to the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest, with later missions envisaging a lunar space station and a sustainable presence on the lunar surface.

According to NASA chief Bill Nelson, a crewed trip to the red planet aboard Orion, which would last several years, could be attempted by the end of the 2030s.

E.Lau--ThChM