The China Mail - S.Africa teens build solar train as power cuts haunt commuters

USD -
AED 3.67295
AFN 66.503991
ALL 80.603989
AMD 366.170403
AOA 917.000367
ARS 1491.937904
AUD 1.414627
AWG 1.80125
AZN 1.70397
BAM 1.696506
BBD 2.013896
BDT 123.776354
BHD 0.377104
BIF 2987.5
BMD 1
BND 1.281271
BOB 11.884005
BRL 5.083304
BSD 0.999879
BTN 95.145572
BWP 13.496235
BYN 2.977343
BYR 19600
BZD 2.010921
CAD 1.39555
CDF 2262.50392
CHF 0.80802
CLF 0.023137
CLP 913.560396
CNY 6.747604
CNH 6.743285
COP 3157.16
CRC 454.53954
CUC 1
CUP 26.5
CVE 95.703894
CZK 20.982104
DJF 177.720393
DKK 6.46804
DOP 58.250393
DZD 132.93304
EGP 49.555853
ERN 15
ETB 160.000358
EUR 0.86495
FJD 2.20855
FKP 0.740916
GBP 0.741235
GEL 2.610391
GGP 0.740916
GHS 11.76039
GIP 0.740916
GMD 73.503851
GNF 8775.000355
GTQ 7.628986
GYD 209.187745
HKD 7.84315
HNL 26.880388
HRK 6.518804
HTG 130.738004
HUF 314.060388
IDR 17801
ILS 2.99985
IMP 0.740916
INR 95.13785
IQD 1310.5
IRR 1375550.000352
ISK 123.340386
JEP 0.740916
JMD 158.790465
JOD 0.70904
JPY 157.80604
KES 128.780385
KGS 87.450384
KHR 4052.503796
KMF 426.00035
KRW 1407.890383
KWD 0.30866
KYD 0.833247
KZT 468.616634
LAK 22582.503779
LBP 89550.000349
LKR 335.380452
LRD 181.550382
LSL 16.130381
LTL 2.95274
LVL 0.60489
LYD 6.365039
MAD 9.305039
MDL 17.387495
MGA 4310.000347
MKD 53.374161
MMK 2099.750695
MNT 3597.347644
MOP 8.079926
MRU 40.090379
MUR 47.050378
MVR 15.450378
MWK 1737.000345
MXN 17.136204
MYR 4.090104
MZN 63.905039
NAD 16.250377
NGN 1364.860377
NIO 36.795607
NOK 9.51237
NPR 152.232915
NZD 1.696641
OMR 0.382792
PAB 0.999866
PEN 3.385039
PGK 4.42225
PHP 60.705038
PKR 277.803701
PLN 3.719205
PYG 5945.498155
QAR 3.644504
RON 4.536304
RSD 102.024038
RUB 81.892834
RWF 1465
SAR 3.780227
SBD 8.065696
SCR 14.475038
SDG 600.503676
SEK 9.480804
SGD 1.278204
SLE 24.603667
SOS 600.503662
SRD 37.866504
STD 20697.981008
STN 21.375
SVC 8.749095
SZL 16.245038
THB 33.050369
TJS 9.223917
TMT 3.51
TND 2.912038
TRY 47.697504
TTD 6.777323
TWD 32.250604
TZS 2647.503038
UAH 44.783463
UGX 3724.827703
UYU 40.249652
UZS 11950.000334
VES 755.762404
VND 26204.5
VUV 119.414824
WST 2.733661
XAF 568.992228
XAG 0.015756
XAU 0.00023
XCD 2.70255
XCG 1.802071
XDR 0.708194
XOF 568.000332
XPF 103.350363
YER 238.403589
ZAR 16.14632
ZMK 9001.203584
ZMW 18.872278
ZWL 321.999592
  • CMSC

    0.0240

    21.744

    +0.11%

  • BCE

    -0.0200

    22.75

    -0.09%

  • CMSD

    -0.1600

    21.82

    -0.73%

  • VOD

    0.1900

    16.19

    +1.17%

  • RIO

    1.4500

    101.1

    +1.43%

  • RELX

    0.0485

    35.52

    +0.14%

  • RYCEF

    0.2300

    20.85

    +1.1%

  • RBGPF

    0.7600

    70.5

    +1.08%

  • BCC

    2.3400

    86.6

    +2.7%

  • JRI

    0.1500

    12.81

    +1.17%

  • BTI

    0.6000

    59.33

    +1.01%

  • GSK

    0.7900

    52.96

    +1.49%

  • BP

    -0.6000

    41.63

    -1.44%

  • NGG

    0.4700

    80.88

    +0.58%

  • AZN

    1.4100

    161.42

    +0.87%

S.Africa teens build solar train as power cuts haunt commuters
S.Africa teens build solar train as power cuts haunt commuters / Photo: © AFP

S.Africa teens build solar train as power cuts haunt commuters

For years, students in a South African township have seen their parents struggle to use trains for daily commutes, the railways frequently hobbled by power outages and cable thefts.

Text size:

To respond to the crisis, a group of 20 teenagers invented South Africa's first fully solar-powered train.

Photovoltaic panels fitted to the roof, the angular blue-and-white test train moves on an 18-metre-long (60 feet) test track in Soshanguve township north of the capital Pretoria.

Trains are the cheapest mode of transport in South Africa, used mostly by the poor and working class.

"Our parents... no longer use trains (because of) cable theft... and load shedding," said Ronnie Masindi, 18, referring to rolling blackouts caused by failures at old and poorly maintained coal-powered plants.

The state power company Eskom started imposing on-and-off power rationing 15 years ago to prevent a total national blackout.

The power outages, known locally as load-shedding, have worsened over the years disrupting commerce and industry, including rail services.

Infrastructure operator Transnet has struggled to keep rail traffic flowing smoothly since the economic challenges of the pandemic fuelled a surge in cable theft.

By 2020, rail use among public transport users was down almost two-thirds compared to 2013, according to the National Households Travel Survey with many commuters turning to more expensive minibus taxis.

Masindi said they decided to "create and build a solar-powered train that uses solar to move instead of (mains) electricity".

The journey has not been without its challenges.

A lack of funding delayed production of the prototype locomotive, and the government later chipped in.

"It was not a straight line," said another student, Lethabo Nkadimeng, 17. "It was like taking a hike to the highest peak of the mountain."

The train, which can run at 30 kilometres (20 miles) per hour, was showcased at a recent universities innovation event.

For now, the prototype can run for 10 return trips on the track installed on the grounds of a school.

It will be used for further research, and eventually presented as a model the government could adopt.

Fitted with car seats and a flat-screen TV to entertain passengers, it took the students two years to build.

"What we have realised is, if we you give township learners space, resources and a little mentorship they can do anything that any learner can do around the world," said Kgomotso Maimane, the project's supervising teacher.

U.Chen--ThChM