The China Mail - Village braces for closure of Spain's largest nuclear plant

USD -
AED 3.672497
AFN 63.999735
ALL 81.141852
AMD 368.092423
ANG 1.789884
AOA 917.999724
ARS 1387.744128
AUD 1.377961
AWG 1.80125
AZN 1.698512
BAM 1.66265
BBD 2.014749
BDT 122.739232
BGN 1.668102
BHD 0.377779
BIF 2977.17516
BMD 1
BND 1.266375
BOB 6.912147
BRL 4.916696
BSD 1.000319
BTN 94.284014
BWP 13.393294
BYN 2.82688
BYR 19600
BZD 2.011842
CAD 1.362805
CDF 2316.000035
CHF 0.777903
CLF 0.022745
CLP 895.179889
CNY 6.81125
CNH 6.799598
COP 3716.6
CRC 458.882886
CUC 1
CUP 26.5
CVE 93.737647
CZK 20.649398
DJF 178.129529
DKK 6.34889
DOP 59.489098
DZD 132.213587
EGP 52.726801
ERN 15
ETB 156.191986
EUR 0.84961
FJD 2.181104
FKP 0.735472
GBP 0.734175
GEL 2.680352
GGP 0.735472
GHS 11.253597
GIP 0.735472
GMD 73.500947
GNF 8779.111037
GTQ 7.638065
GYD 209.28562
HKD 7.831765
HNL 26.592878
HRK 6.400803
HTG 131.015429
HUF 302.334499
IDR 17300
ILS 2.90745
IMP 0.735472
INR 94.133798
IQD 1310.409317
IRR 1312999.999643
ISK 122.179878
JEP 0.735472
JMD 157.559837
JOD 0.70902
JPY 156.381002
KES 129.149713
KGS 87.420498
KHR 4012.462436
KMF 419.000174
KPW 900.010907
KRW 1450.895031
KWD 0.30775
KYD 0.833606
KZT 463.246483
LAK 21952.079977
LBP 89578.733949
LKR 322.106516
LRD 183.561655
LSL 16.321053
LTL 2.95274
LVL 0.60489
LYD 6.327387
MAD 9.168463
MDL 17.210233
MGA 4153.5787
MKD 52.354887
MMK 2099.841446
MNT 3580.445259
MOP 8.06845
MRU 40.023293
MUR 46.719433
MVR 15.454981
MWK 1734.539906
MXN 17.20267
MYR 3.909993
MZN 63.909739
NAD 16.320915
NGN 1358.460041
NIO 36.809868
NOK 9.233235
NPR 150.856686
NZD 1.67248
OMR 0.3845
PAB 1.00031
PEN 3.464888
PGK 4.353426
PHP 60.347982
PKR 278.719136
PLN 3.591485
PYG 6122.509702
QAR 3.646217
RON 4.473302
RSD 99.735794
RUB 74.675989
RWF 1466.504015
SAR 3.758223
SBD 8.019432
SCR 13.778628
SDG 600.499459
SEK 9.196985
SGD 1.265705
SHP 0.746601
SLE 24.649739
SLL 20969.496166
SOS 571.690887
SRD 37.411022
STD 20697.981008
STN 20.827577
SVC 8.752758
SYP 110.548305
SZL 16.315722
THB 32.142015
TJS 9.348017
TMT 3.505
TND 2.901604
TOP 2.40776
TRY 45.244201
TTD 6.76678
TWD 31.391498
TZS 2594.68297
UAH 43.802978
UGX 3741.312987
UYU 39.99779
UZS 12121.753102
VES 493.496435
VND 26310
VUV 118.093701
WST 2.711513
XAF 557.627717
XAG 0.012324
XAU 0.000211
XCD 2.70255
XCG 1.80278
XDR 0.694413
XOF 557.637198
XPF 101.384408
YER 238.624994
ZAR 16.25924
ZMK 9001.198129
ZMW 19.055796
ZWL 321.999592
  • RBGPF

    0.0000

    63.18

    0%

  • RYCEF

    0.8000

    17.3

    +4.62%

  • GSK

    0.1500

    50.53

    +0.3%

  • BP

    -1.8700

    44.63

    -4.19%

  • RELX

    -0.4100

    35.75

    -1.15%

  • RIO

    5.0100

    105.51

    +4.75%

  • BCE

    0.1300

    24.23

    +0.54%

  • CMSC

    0.1300

    23.01

    +0.56%

  • NGG

    0.2100

    87.85

    +0.24%

  • VOD

    0.3900

    16.13

    +2.42%

  • BTI

    0.1600

    59.56

    +0.27%

  • BCC

    2.1100

    74.24

    +2.84%

  • AZN

    3.6800

    184.92

    +1.99%

  • CMSD

    0.1300

    23.42

    +0.56%

  • JRI

    0.1300

    13.17

    +0.99%

Village braces for closure of Spain's largest nuclear plant
Village braces for closure of Spain's largest nuclear plant / Photo: © AFP

Village braces for closure of Spain's largest nuclear plant

In the western Spanish village of Almaraz, the uncertain future of the country's biggest nuclear power plant casts a pall over daily life.

Text size:

The Almaraz plant, which contributes around seven percent of Spain's electricity production, is slated to close in 2028 as part of the leftist government's plan to shut all nuclear reactors by 2035.

But last year's nationwide blackout and recent fuel supply disruptions linked to the war in the Middle East have rekindled debate over the phase-out, mirroring a wider reassessment of nuclear power across Europe.

"It's sad that they want to shut it down," said Jose Antonio Morgado, a 59-year-old mechanic who has worked seasonal refuelling operations at the plant since 1989.

Each year, during the complex process of replacing nuclear fuel in the reactors, Morgado joins hundreds of temporary workers brought in to support the facility's roughly 800 permanent employees.

The work can pay up to 6,000 euros (about $7,000) a month -- a substantial income in one of Spain's poorest regions.

Those wages will disappear if Spain follows through on plans announced by Socialist Prime Minister Pedro Sanchez in 2019 to close the plant's first reactor in 2027, and the second in 2028, as part of a transition to renewable energy.

The three Spanish energy companies that own the site initially agreed to that timetable. But they now argue that keeping the reactors online until 2030 would strengthen energy security and help stabilise electricity prices.

The government is expected to decide by the end of October.

- 'Desert' -

In the centre of Almaraz, a village of about 1,500 people surrounded by gently rolling countryside, businesses are increasingly worried.

"It would be a desert here" if the site closes, said David Martin, 32, who runs a restaurant in Almaraz that his parents opened in the 1980s at the same time as the plant.

During refuelling periods, Martin serves up to 260 meals a day. In quieter periods, that falls to around 80.

Without the nuclear plant, he estimates business would drop by nearly half, forcing him to lay off half of his 12 employees.

The economic stakes have mobilised local residents.

Last year, supporters of the plant formed a grassroots campaign group called "Si a Almaraz, Si al Futuro" (Yes to Almaraz, Yes to the Future) to pressure the government to reconsider the closure schedule.

The group's leader, Fernando Sanchez Castilla, a long-time plant employee who also serves as mayor of a nearby village, warns that shutting the facility would devastate dozens of surrounding communities.

"This is the region's main industry," he said, estimating the plant accounts for roughly five percent of the economic output of the western region of Extremadura and supports about 4,000 direct and indirect jobs.

- 'Be brave' -

The Almaraz plant, with its two large white domes rising above the countryside, could continue operating for several more years, said Patricia Rubio Oviedo, head of the site's technical operations office.

"Nuclear energy is essential in the energy mix," she said, arguing it provides stable electricity, unlike renewable sources such as wind and solar, whose output can fluctuate.

The European Commission has urged member states to avoid prematurely shutting existing nuclear facilities as part of efforts to reduce reliance on fossil fuels and strengthen energy independence.

Sanchez's government, however, remains firmly committed to its green energy agenda.

Drawing on Spain's sunny plains, windy hillsides and fast-flowing rivers, the country aims to increase the share of electricity generated by renewables to 81 percent by 2030, up from around 60 percent today.

"The government has to be brave. It cannot change its mind because its credibility is at stake," said Francisco del Pozo Campos, a spokesman for Greenpeace Spain.

Extending the plant's operation until 2030 would raise costs for consumers and lead to an estimated 26 billion euros loss in renewable energy investment, he added.

Spain's ecological transition ministry said it was preparing support measures for workers, including retraining programmes linked to a planned electric vehicle battery factory set to open nearby by a Chinese industrial group.

This is little comfort to local residents.

"If these families leave, what will be left for us?" asked Martin, as he scanned his nearly full restaurant.

C.Mak--ThChM