The China Mail - Village braces for closure of Spain's largest nuclear plant

USD -
AED 3.672504
AFN 63.502065
ALL 83.129935
AMD 367.929695
ANG 1.790403
AOA 917.510825
ARS 1479.001976
AUD 1.449171
AWG 1.80125
AZN 1.703002
BAM 1.724577
BBD 2.013888
BDT 122.992813
BGN 1.69088
BHD 0.377147
BIF 2984.81535
BMD 1
BND 1.298984
BOB 6.909809
BRL 5.212501
BSD 0.999934
BTN 94.624111
BWP 13.680173
BYN 2.818068
BYR 19600
BZD 2.01104
CAD 1.42306
CDF 2269.000078
CHF 0.812397
CLF 0.023341
CLP 918.649878
CNY 6.7905
CNH 6.81377
COP 3446.19
CRC 455.186766
CUC 1
CUP 26.5
CVE 97.22259
CZK 21.3314
DJF 177.720414
DKK 6.5809
DOP 58.613453
DZD 133.491532
EGP 49.606497
ERN 15
ETB 158.649909
EUR 0.880397
FJD 2.26715
FKP 0.758197
GBP 0.75975
GEL 2.640017
GGP 0.758197
GHS 11.199781
GIP 0.758197
GMD 72.495399
GNF 8761.518452
GTQ 7.627362
GYD 209.162776
HKD 7.839898
HNL 26.7202
HRK 6.633503
HTG 130.744947
HUF 313.043501
IDR 17967
ILS 2.987899
IMP 0.758197
INR 94.47035
IQD 1310
IRR 1375050.00053
ISK 126.949859
JEP 0.758197
JMD 157.488647
JOD 0.708979
JPY 161.762995
KES 129.529453
KGS 87.450149
KHR 4017.494974
KMF 433.999843
KPW 900.00035
KRW 1542.304285
KWD 0.30949
KYD 0.833297
KZT 486.623047
LAK 22065.000091
LBP 89549.999851
LKR 337.341005
LRD 182.250303
LSL 16.590249
LTL 2.95274
LVL 0.60489
LYD 6.405016
MAD 9.415501
MDL 17.709096
MGA 4224.999805
MKD 54.277663
MMK 2099.539901
MNT 3580.066416
MOP 8.076099
MRU 40.069821
MUR 48.210313
MVR 15.449856
MWK 1736.999969
MXN 17.60321
MYR 4.137983
MZN 63.909993
NAD 16.589831
NGN 1373.859715
NIO 36.610486
NOK 9.83597
NPR 151.394749
NZD 1.770852
OMR 0.384501
PAB 0.999965
PEN 3.421971
PGK 4.38325
PHP 61.409505
PKR 278.049549
PLN 3.77355
PYG 6099.351442
QAR 3.644965
RON 4.609596
RSD 103.362977
RUB 74.875012
RWF 1466
SAR 3.741267
SBD 8.051953
SCR 14.699001
SDG 599.999684
SEK 9.74879
SGD 1.297495
SHP 0.746601
SLE 24.803112
SLL 20969.503664
SOS 571.501729
SRD 37.459634
STD 20697.981008
STN 21.675
SVC 8.749173
SYP 110.532098
SZL 16.590069
THB 33.430162
TJS 9.284423
TMT 3.5
TND 2.937498
TOP 2.40776
TRY 46.49367
TTD 6.780184
TWD 31.815897
TZS 2620.57021
UAH 44.88455
UGX 3689.350352
UYU 39.918699
UZS 12015.000302
VES 620.752985
VND 26335
VUV 118.798432
WST 2.761642
XAF 578.424923
XAG 0.017413
XAU 0.00025
XCD 2.70255
XCG 1.802141
XDR 0.716966
XOF 573.000468
XPF 105.498209
YER 238.624983
ZAR 16.558699
ZMK 9001.197731
ZMW 18.024056
ZWL 321.999592
  • RBGPF

    0.9600

    61.3

    +1.57%

  • RYCEF

    -0.4700

    18.16

    -2.59%

  • CMSC

    -0.0450

    22.065

    -0.2%

  • CMSD

    0.0600

    22.02

    +0.27%

  • RIO

    -1.5500

    94.03

    -1.65%

  • RELX

    -0.0600

    31.15

    -0.19%

  • BCE

    0.1600

    23.2

    +0.69%

  • AZN

    2.0000

    183.02

    +1.09%

  • GSK

    -0.9800

    51.09

    -1.92%

  • BCC

    5.8600

    77.66

    +7.55%

  • VOD

    -0.2400

    13.81

    -1.74%

  • NGG

    1.2600

    82.83

    +1.52%

  • BP

    -1.4700

    37.86

    -3.88%

  • BTI

    0.6500

    61.39

    +1.06%

  • JRI

    -0.0600

    12.57

    -0.48%

Village braces for closure of Spain's largest nuclear plant
Village braces for closure of Spain's largest nuclear plant / Photo: © AFP

Village braces for closure of Spain's largest nuclear plant

In the western Spanish village of Almaraz, the uncertain future of the country's biggest nuclear power plant casts a pall over daily life.

Text size:

The Almaraz plant, which contributes around seven percent of Spain's electricity production, is slated to close in 2028 as part of the leftist government's plan to shut all nuclear reactors by 2035.

But last year's nationwide blackout and recent fuel supply disruptions linked to the war in the Middle East have rekindled debate over the phase-out, mirroring a wider reassessment of nuclear power across Europe.

"It's sad that they want to shut it down," said Jose Antonio Morgado, a 59-year-old mechanic who has worked seasonal refuelling operations at the plant since 1989.

Each year, during the complex process of replacing nuclear fuel in the reactors, Morgado joins hundreds of temporary workers brought in to support the facility's roughly 800 permanent employees.

The work can pay up to 6,000 euros (about $7,000) a month -- a substantial income in one of Spain's poorest regions.

Those wages will disappear if Spain follows through on plans announced by Socialist Prime Minister Pedro Sanchez in 2019 to close the plant's first reactor in 2027, and the second in 2028, as part of a transition to renewable energy.

The three Spanish energy companies that own the site initially agreed to that timetable. But they now argue that keeping the reactors online until 2030 would strengthen energy security and help stabilise electricity prices.

The government is expected to decide by the end of October.

- 'Desert' -

In the centre of Almaraz, a village of about 1,500 people surrounded by gently rolling countryside, businesses are increasingly worried.

"It would be a desert here" if the site closes, said David Martin, 32, who runs a restaurant in Almaraz that his parents opened in the 1980s at the same time as the plant.

During refuelling periods, Martin serves up to 260 meals a day. In quieter periods, that falls to around 80.

Without the nuclear plant, he estimates business would drop by nearly half, forcing him to lay off half of his 12 employees.

The economic stakes have mobilised local residents.

Last year, supporters of the plant formed a grassroots campaign group called "Si a Almaraz, Si al Futuro" (Yes to Almaraz, Yes to the Future) to pressure the government to reconsider the closure schedule.

The group's leader, Fernando Sanchez Castilla, a long-time plant employee who also serves as mayor of a nearby village, warns that shutting the facility would devastate dozens of surrounding communities.

"This is the region's main industry," he said, estimating the plant accounts for roughly five percent of the economic output of the western region of Extremadura and supports about 4,000 direct and indirect jobs.

- 'Be brave' -

The Almaraz plant, with its two large white domes rising above the countryside, could continue operating for several more years, said Patricia Rubio Oviedo, head of the site's technical operations office.

"Nuclear energy is essential in the energy mix," she said, arguing it provides stable electricity, unlike renewable sources such as wind and solar, whose output can fluctuate.

The European Commission has urged member states to avoid prematurely shutting existing nuclear facilities as part of efforts to reduce reliance on fossil fuels and strengthen energy independence.

Sanchez's government, however, remains firmly committed to its green energy agenda.

Drawing on Spain's sunny plains, windy hillsides and fast-flowing rivers, the country aims to increase the share of electricity generated by renewables to 81 percent by 2030, up from around 60 percent today.

"The government has to be brave. It cannot change its mind because its credibility is at stake," said Francisco del Pozo Campos, a spokesman for Greenpeace Spain.

Extending the plant's operation until 2030 would raise costs for consumers and lead to an estimated 26 billion euros loss in renewable energy investment, he added.

Spain's ecological transition ministry said it was preparing support measures for workers, including retraining programmes linked to a planned electric vehicle battery factory set to open nearby by a Chinese industrial group.

This is little comfort to local residents.

"If these families leave, what will be left for us?" asked Martin, as he scanned his nearly full restaurant.

C.Mak--ThChM