The China Mail - Bad day in space: Moon mission fails and NASA program delayed

USD -
AED 3.672498
AFN 64.999684
ALL 81.389828
AMD 361.2932
ANG 1.789785
AOA 916.999881
ARS 1513.020231
AUD 1.442399
AWG 1.80125
AZN 1.686468
BAM 1.743992
BBD 2.01427
BDT 123.014493
BGN 1.747831
BHD 0.377794
BIF 2993.226401
BMD 1
BND 1.282569
BOB 11.726198
BRL 5.097977
BSD 1.000134
BTN 95.013601
BWP 13.749894
BYN 3.018725
BYR 19600
BZD 2.011416
CAD 1.418751
CDF 2313.497365
CHF 0.827285
CLF 0.024943
CLP 981.679834
CNY 6.691201
CNH 6.69015
COP 3177.15
CRC 455.208273
CUC 1
CUP 24.002354
CVE 98.341137
CZK 21.69855
DJF 178.095875
DKK 6.66337
DOP 61.31577
DZD 134.596967
EGP 53.426401
ERN 15
ETB 163.359658
EUR 0.891403
FJD 2.26765
FKP 0.76043
GBP 0.752925
GEL 2.590554
GGP 0.76043
GHS 11.63612
GIP 0.76043
GMD 73.510825
GNF 8798.177043
GTQ 7.64058
GYD 209.177258
HKD 7.84765
HNL 26.852294
HRK 6.716402
HTG 130.962733
HUF 324.548979
IDR 18073.2
ILS 3.103975
IMP 0.76043
INR 94.70475
IQD 1515.163677
IRR 1795877.486919
ISK 121.430331
JEP 0.76043
JMD 159.02858
JOD 0.709022
JPY 157.941997
KES 129.839878
KGS 87.450411
KHR 4061.592797
KMF 439.999764
KPW 899.999961
KRW 1345.434978
KWD 0.31097
KYD 0.833434
KZT 453.247002
LAK 22495.12827
LBP 89534.463932
LKR 331.054657
LRD 170.517331
LSL 16.527044
LTL 2.95274
LVL 0.60489
LYD 6.424972
MAD 9.801026
MDL 17.972147
MGA 4504.813845
MKD 54.969013
MMK 2099.444361
MNT 3596.720368
MOP 8.083816
MRU 40.074203
MUR 47.305142
MVR 15.459916
MWK 1733.876182
MXN 18.44352
MYR 4.083015
MZN 63.900316
NAD 16.526602
NGN 1330.53985
NIO 36.807299
NOK 9.466902
NPR 152.022083
NZD 1.773445
OMR 0.384489
PAB 1.000134
PEN 3.440357
PGK 4.539556
PHP 63.032962
PKR 276.852798
PLN 3.896305
PYG 5695.429208
QAR 3.645574
RON 4.754496
RSD 104.684958
RUB 83.900735
RWF 1475.681051
SAR 3.752248
SBD 8.064647
SCR 14.00815
SDG 601.50115
SEK 9.94804
SGD 1.28205
SHP 0.754745
SLE 24.68013
SLL 20969.504398
SOS 571.596752
SRD 37.641497
STD 20697.981008
STN 21.850516
SVC 8.750831
SYP 13001.999685
SZL 16.520847
THB 33.517497
TJS 9.216088
TMT 3.51
TND 3.003166
TOP 2.40776
TRY 49.512397
TTD 6.787869
TWD 32.481992
TZS 2639.985017
UAH 44.862452
UGX 4024.972129
UYU 40.223504
UZS 11961.649944
VES 878.023598
VND 25866.5
VUV 119.689611
WST 2.781623
XAF 584.722044
XAG 0.017324
XAU 0.000239664757
XCD 2.70255
XCG 1.802429
XDR 0.707052
XOF 584.722044
XPF 106.363434
YER 236.149747
ZAR 16.48535
ZMK 9001.198816
ZMW 19.926867
ZWL 321.999592
SSP 5773.824733
MXV 2.08258
  • RYCEF

    0.4000

    19.71

    +2.03%

  • CMSC

    0.0000

    20.4

    0%

  • BTI

    0.4200

    56.05

    +0.75%

  • BP

    0.2800

    44.43

    +0.63%

  • RBGPF

    1.6000

    67

    +2.39%

  • RIO

    -0.1500

    94.41

    -0.16%

  • AZN

    -0.4300

    166.15

    -0.26%

  • GSK

    0.4600

    49.7

    +0.93%

  • BCE

    -0.4100

    20.56

    -1.99%

  • NGG

    -0.2500

    75.24

    -0.33%

  • VOD

    -0.0400

    16.58

    -0.24%

  • RELX

    -0.4500

    33.07

    -1.36%

  • BCC

    -0.5500

    76.59

    -0.72%

  • CMSD

    -0.0300

    20.27

    -0.15%

  • JRI

    -0.2500

    10.77

    -2.32%

Bad day in space: Moon mission fails and NASA program delayed

Bad day in space: Moon mission fails and NASA program delayed

A private US lunar lander mission is doomed to fail, and NASA pushes back plans to return astronauts to the Moon.

Text size:

The twin developments Tuesday represent blows to America's ambitions to stimulate a commercial space economy, develop a lasting presence on Earth's nearest neighbor, and use it as a jump off point for Mars.

China meanwhile is looming in the rear view mirror, targeting 2030 for a crewed landing.

Astrobotic's Peregrine Lunar Lander blasted off Monday from Florida's Cape Canaveral Space Force Station, then successfully separated from its rocket.

Just hours later, though, Astrobotic reported an inability to orient Peregrine's solar panel towards the Sun and keep its battery topped up. A propulsion system glitch was found to be causing a critical loss of fuel and damaging the spacecraft's exterior.

The company said Monday the mission had "no chance of soft landing" -- dashing hopes for the first ever successful landing by a non-government mission, and America's first soft touchdown on the Moon since Apollo 17 in 1972.

NASA has paid Astrobotic more than $100 million to ship scientific hardware to the Moon to answer questions about surface composition and radiation, as the US space agency prepares to send astronauts back for long term missions.

The failure doesn't mean the strategy of ramping up commercial partnerships is innately flawed, Michael Lembeck, a former NASA official turned associate professor in aerospace engineering at the University of Illinois told AFP.

"It's a balance of making progress versus accepting risk -- and I think in the long term these failures are just as informative success," he said, adding NASA's contracts with other companies, including Houston-based Intuitive Machines, which will attempt to launch a lander next month, helped spread such risks.

- Artemis safety issues -

But, further spoiling the mood for space watchers, NASA Administrator Bill Nelson announced the agency was pushing back its planned return of astronauts to the lunar surface from December 2025 to September 2026, citing safety issues with the Orion crew capsule.

And few analysts believe the new date for American boots on the Moon is credible.

In a briefing Tuesday, NASA officials went into new detail about concerns linked to the Orion capsule built by Lockheed Martin.

First, the uncrewed Artemis 1 mission revealed the heat shield lost some of its material during its fiery reentry to the atmosphere.

Second, a design flaw has been uncovered during new testing in Orion's ability to open and shut valves connected to the life support system -- described by Amit Kshatriya, deputy associate administrator for the Moon to Mars program -- as "unacceptable."

Third, when engineers put the vehicle under stress testing to simulate an emergency ejection from the Space Launch Systems (SLS) rocket, they found a battery became disconnected, meaning Orion might not be able to maintain power as it floats back to the ground.

- SpaceX complications -

While it's back to the drawing board for Orion, its issues are dwarfed by the fact that the Artemis 3 lander, a modified version of SpaceX's next-gen Starship rocket, is nowhere near ready, having exploded in its two orbital test flights to date.

Even once Starship stops blowing up, SpaceX will have to succeed in its own uncrewed lunar landing ahead of Artemis 3.

Its complex plans involve launching a spaceship to serve as a fuel depot, having 10 more Starships launch and fuel up the depot, then having yet another Starship collect that fuel and journey to the Moon, where it would dock with an Orion capsule and fly down to the surface.

Given these constraints, the new deadline is far from realistic, said Lembeck, stressing that compared to the Apollo years, NASA is working to a much tighter budget, in a more risk-averse era, without a national imperative to beat the Soviet Union.

K.Leung--ThChM