The China Mail - NASA Moon rocket ready for second attempt at liftoff

USD -
AED 3.67305
AFN 62.510374
ALL 82.32818
AMD 368.450128
ANG 1.79046
AOA 917.99996
ARS 1441.9913
AUD 1.422141
AWG 1.8025
AZN 1.634371
BAM 1.690457
BBD 2.013389
BDT 122.882912
BGN 1.66992
BHD 0.377098
BIF 2986
BMD 1
BND 1.28527
BOB 6.907788
BRL 5.190802
BSD 0.999607
BTN 95.321771
BWP 13.521701
BYN 2.761041
BYR 19600
BZD 2.010536
CAD 1.394935
CDF 2276.000211
CHF 0.79755
CLF 0.023299
CLP 916.87999
CNY 6.77275
CNH 6.777235
COP 3579.41
CRC 461.297112
CUC 1
CUP 26.5
CVE 95.650298
CZK 20.927749
DJF 177.720158
DKK 6.471635
DOP 58.249944
DZD 133.651971
EGP 51.715701
ERN 15
ETB 161.164522
EUR 0.865898
FJD 2.219302
FKP 0.749189
GBP 0.747119
GEL 2.659728
GGP 0.749189
GHS 11.800805
GIP 0.749189
GMD 72.499281
GNF 8756.606782
GTQ 7.620003
GYD 209.14383
HKD 7.837455
HNL 26.726872
HRK 6.523987
HTG 130.70517
HUF 308.260177
IDR 17972.55
ILS 2.94556
IMP 0.749189
INR 95.39135
IQD 1309.55828
IRR 1375049.99991
ISK 124.169701
JEP 0.749189
JMD 157.852658
JOD 0.70901
JPY 160.365029
KES 129.380504
KGS 87.449697
KHR 4015.713662
KMF 426.999467
KPW 899.855249
KRW 1528.080303
KWD 0.30927
KYD 0.833049
KZT 488.143446
LAK 22012.092087
LBP 89518.693467
LKR 337.385637
LRD 182.435791
LSL 16.444633
LTL 2.95274
LVL 0.60489
LYD 6.370979
MAD 9.239519
MDL 17.383563
MGA 4193.76726
MKD 53.372647
MMK 2099.173167
MNT 3578.677969
MOP 8.06868
MRU 39.915986
MUR 47.86995
MVR 15.449987
MWK 1733.429563
MXN 17.42661
MYR 4.0618
MZN 63.910178
NAD 16.441861
NGN 1359.659689
NIO 36.786219
NOK 9.497185
NPR 152.515007
NZD 1.717888
OMR 0.384515
PAB 0.999693
PEN 3.471008
PGK 4.37524
PHP 61.513498
PKR 278.17763
PLN 3.67303
PYG 6156.505207
QAR 3.644363
RON 4.535804
RSD 101.634745
RUB 71.975669
RWF 1463.756153
SAR 3.754398
SBD 8.048583
SCR 13.562143
SDG 600.5023
SEK 9.461135
SGD 1.28675
SHP 0.746601
SLE 24.606766
SLL 20969.502105
SOS 571.32732
SRD 37.47402
STD 20697.981008
STN 21.176277
SVC 8.747099
SYP 110.532098
SZL 16.44057
THB 32.899498
TJS 9.326724
TMT 3.5
TND 2.938291
TOP 2.40776
TRY 46.118698
TTD 6.78073
TWD 31.610598
TZS 2609.998041
UAH 44.90689
UGX 3771.10605
UYU 40.468298
UZS 12018.617837
VES 562.585085
VND 26330
VUV 119.284637
WST 2.746352
XAF 566.968465
XAG 0.015306
XAU 0.000234
XCD 2.70255
XCG 1.801626
XDR 0.708406
XOF 566.963564
XPF 103.080932
YER 238.624979
ZAR 16.51652
ZMK 9001.196918
ZMW 17.754364
ZWL 321.999592
  • RBGPF

    1.4900

    61.5

    +2.42%

  • CMSC

    -0.0500

    22.31

    -0.22%

  • RYCEF

    -0.1500

    16.37

    -0.92%

  • BCC

    2.0400

    70.01

    +2.91%

  • NGG

    0.9100

    81.08

    +1.12%

  • GSK

    0.6100

    51.25

    +1.19%

  • BCE

    0.4000

    24.58

    +1.63%

  • RIO

    0.4900

    101.42

    +0.48%

  • BTI

    0.2600

    59.95

    +0.43%

  • RELX

    0.4200

    34.94

    +1.2%

  • VOD

    -0.1400

    14.67

    -0.95%

  • AZN

    1.8800

    183.43

    +1.02%

  • CMSD

    -0.1300

    22.28

    -0.58%

  • JRI

    0.2600

    12.72

    +2.04%

  • BP

    -1.0500

    42.67

    -2.46%

NASA Moon rocket ready for second attempt at liftoff
NASA Moon rocket ready for second attempt at liftoff / Photo: © AFP

NASA Moon rocket ready for second attempt at liftoff

After technical issues halted its first launch attempt, NASA will try again on Saturday to get its new 30-story rocket off the ground and send its unmanned test capsule towards the Moon.

Text size:

If the massive Space Launch System (SLS) lifts off successfully, it will not only be awe-inspiring but also historic for NASA, marking the first of its Artemis program plotting a return to the Moon, fifty years after the final Apollo mission.

The launch is scheduled for 2:17 pm local time (1817 GMT) from Kennedy Space Center in Florida, with a possible two-hour delay if necessary.

"Our team is ready," said Jeremy Parsons, deputy manager of exploration ground systems at Kennedy Space Center, on Friday.

"They are getting better with every attempt and actually performed superbly during launch countdown number one... I think if the conditions with weather and the hardware align, we'll absolutely go."

Though the area around the launch site will be closed to the public, hundreds of thousands of people are expected to gather on beaches nearby to see -- and hear -- the most powerful vehicle that NASA has ever launched climb into space.

NASA's initial launch attempt on Monday was halted after engineers detected a fuel leak and a sensor showed that one of the rocket's four main engines was too hot.

Both issues have since been resolved, and the weather appears to be cooperating: the US Space Force predicts a 60 percent chance of favorable weather at the scheduled liftoff time, growing to 80 percent later in the launch window.

If something requires NASA to stand down again on Saturday, there are backup opportunities on Monday or Tuesday. After that, the next launch window will not be until September 19 at the earliest, due to the Moon's position.

The purpose of the Artemis 1 mission is to verify that the Orion capsule, which sits atop the SLS rocket, is safe to carry astronauts in the future.

Mannequins equipped with sensors are standing in for astronauts on the mission and will record acceleration, vibration and radiation levels.

- Apollo's twin sister -

It will take several days for the spacecraft to reach the Moon, flying around 60 miles (100 kilometers) at its closest approach. The capsule will fire its engines to get to a distant retrograde orbit (DRO) of 40,000 miles beyond the Moon, a record for a spacecraft rated to carry humans.

The trip is expected to last around six weeks and one of its main objectives is to test the capsule's heat shield, which at 16 feet in diameter is the largest ever built.

On its return to Earth's atmosphere, the heat shield will have to withstand speeds of 25,000 miles per hour and a temperature of 5,000 degrees Fahrenheit (2,760 degrees Celsius) -- roughly half as hot as the Sun.

Artemis is named after the twin sister of the Greek god Apollo, after whom the first Moon missions were named.

Unlike the Apollo missions, which sent only white men to the Moon between 1969 and 1972, Artemis missions will see the first person of color and the first woman step foot on the lunar surface.

Fittingly, NASA's first woman launch director, Charlie Blackwell-Thompson, will give the final "go" for liftoff on Saturday.

A successful Artemis 1 mission will come as a huge relief to the US space agency, after years of delays and cost overruns.

A government audit estimates the program's cost will grow to $93 billion by 2025, with each of its first four missions clocking in at a whopping $4.1 billion per launch.

The next mission, Artemis 2, will take astronauts to the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest, with later missions envisaging a lunar space station and a sustainable presence on the lunar surface.

According to NASA chief Bill Nelson, a manned trip to the red planet aboard Orion, which would last several years, could be attempted by the end of the 2030s.

B.Carter--ThChM