The China Mail - NASA's Tuesday Moon launch threatened by storm

USD -
AED 3.672504
AFN 65.000368
ALL 81.9979
AMD 361.046432
ANG 1.790403
AOA 917.000367
ARS 1596.41556
AUD 1.500826
AWG 1.8025
AZN 1.70397
BAM 1.785874
BBD 2.016984
BDT 125.580971
BGN 1.77347
BHD 0.377665
BIF 3008.811578
BMD 1
BND 1.291513
BOB 11.872346
BRL 5.559104
BSD 1.001415
BTN 93.180843
BWP 14.815322
BYN 3.013286
BYR 19600
BZD 2.014062
CAD 1.42755
CDF 2280.000362
CHF 0.836062
CLF 0.026251
CLP 1033.182669
CNY 6.664504
CNH 6.655204
COP 3490.663379
CRC 444.596631
CUC 1
CUP 24.034151
CVE 100.684838
CZK 22.338604
DJF 178.331735
DKK 6.833704
DOP 59.909601
DZD 136.546592
EGP 54.510341
ERN 15
ETB 163.703511
EUR 0.913204
FJD 2.29315
FKP 0.763199
GBP 0.763388
GEL 2.590391
GGP 0.763199
GHS 11.892435
GIP 0.763199
GMD 74.000355
GNF 8883.71456
GTQ 7.656485
GYD 209.478154
HKD 7.83005
HNL 26.922339
HRK 6.831965
HTG 131.397525
HUF 338.340388
IDR 18354.45
ILS 3.327204
IMP 0.763199
INR 92.995504
IQD 1518.148199
IRR 1960166.000352
ISK 125.470386
JEP 0.763199
JMD 158.489705
JOD 0.70904
JPY 159.55504
KES 130.383966
KGS 87.450384
KHR 4071.588367
KMF 449.00035
KPW 900.00035
KRW 1333.750383
KWD 0.31272
KYD 0.834589
KZT 459.060403
LAK 22585.034014
LBP 89678.765466
LKR 333.625531
LRD 164.23321
LSL 17.382824
LTL 2.95274
LVL 0.60489
LYD 6.491348
MAD 10.03689
MDL 18.436744
MGA 4534.538648
MKD 56.206912
MMK 2100.121159
MNT 3611.229368
MOP 8.074967
MRU 40.639182
MUR 46.850378
MVR 15.403739
MWK 1736.474456
MXN 19.654704
MYR 4.120804
MZN 64.250377
NAD 17.382824
NGN 1356.550377
NIO 36.853399
NOK 9.801604
NPR 149.089166
NZD 1.824984
OMR 0.382331
PAB 1.001415
PEN 3.473497
PGK 4.582934
PHP 63.756038
PKR 276.722367
PLN 4.08575
PYG 6451.171072
QAR 3.650641
RON 4.884804
RSD 107.446469
RUB 82.244441
RWF 1480.253847
SAR 3.75323
SBD 8.177162
SCR 13.864037
SDG 601.503676
SEK 10.266204
SGD 1.290371
SHP 0.763854
SLE 23.000338
SLL 20969.503664
SOS 572.341688
SRD 37.26037
STD 20697.981008
STN 22.371365
SVC 8.76227
SYP 13002.000337
SZL 17.378441
THB 33.948038
TJS 9.293339
TMT 3.5
TND 3.035383
TOP 2.40776
TRY 50.743804
TTD 6.794503
TWD 33.002104
TZS 2691.412135
UAH 45.089348
UGX 4320.869287
UYU 40.770671
UZS 12037.620417
VES 921.380504
VND 25836.5
VUV 121.507995
WST 2.838507
XAF 599.022624
XAG 0.02286
XAU 0.000273664075
XCD 2.70255
XCG 1.804867
XDR 0.707052
XOF 599.022624
XPF 108.898324
YER 236.603589
ZAR 17.36045
ZMK 9001.203584
ZMW 20.904899
ZWL 321.999592
SSP 5775.400178
MXV 2.198782
  • RYCEF

    0.4000

    19.71

    +2.03%

  • CMSC

    0.0000

    20.4

    0%

  • BTI

    0.4200

    56.05

    +0.75%

  • BP

    0.2800

    44.43

    +0.63%

  • RBGPF

    1.6000

    67

    +2.39%

  • RIO

    -0.1500

    94.41

    -0.16%

  • AZN

    -0.4300

    166.15

    -0.26%

  • GSK

    0.4600

    49.7

    +0.93%

  • BCE

    -0.4100

    20.56

    -1.99%

  • NGG

    -0.2500

    75.24

    -0.33%

  • VOD

    -0.0400

    16.58

    -0.24%

  • RELX

    -0.4500

    33.07

    -1.36%

  • BCC

    -0.5500

    76.59

    -0.72%

  • CMSD

    -0.0300

    20.27

    -0.15%

  • JRI

    -0.2500

    10.77

    -2.32%

NASA's Tuesday Moon launch threatened by storm
NASA's Tuesday Moon launch threatened by storm / Photo: © AFP/File

NASA's Tuesday Moon launch threatened by storm

NASA's historic uncrewed mission to the Moon is facing fresh difficulties.

Text size:

After technical problems derailed two launch attempts several weeks ago, a new liftoff of the Artemis 1 mission scheduled for Tuesday is now threatened by a storm gathering in the Caribbean.

The storm, which has not yet been assigned a name, is currently located south of the Dominican Republic.

But it is expected to grow into a hurricane in the coming days and could move north to Florida, home to the Kennedy Space Center, from which the rocket is set to launch.

"Our plan A is to stay to course and to get the launch off on September 27," Mike Bolger, NASA's exploration ground systems manager, told reporters on Friday. "But we realized we also need to be really paying attention and thinking about a plan B."

That would entail wheeling the giant Space Launch System rocket back to the Vehicle Assembly Building, known as VAB.

"If we were to go down to Plan B we need a couple days to pivot from our current tanking test or launch configuration to execute rollback and get back into the protection of the VAB," Bolger said, adding that a decision should be made by early afternoon on Saturday.

On the launch pad the orange and white SLS rocket can withstand wind gusts of up to 137 kilometers per hour. But if it has to be sheltered, the current launch window, which runs until October 4, will be missed.

The next launch window will run from October 17 to 31, with one possibility of take-off per day, except from October 24-26 and 28.

A successful Artemis 1 mission will come as a huge relief to the US space agency, after years of delays and cost overruns. But another setback would be a blow to NASA, after two previous launch attempts were scrapped when the rocket experienced technical glitches including a fuel leak.

The launch dates depend on NASA receiving a special waiver to avoid having to retest batteries on an emergency flight system that is used to destroy the rocket if it strays from its designated range to a populated area.

On Tuesday the launch window will open at 11:37 local time and will last 70 minutes.

If the rocket takes off that day, the mission will last 39 days before it lands in the Pacific Ocean on November 5.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop, in preparation for future Moon-bound journeys with humans aboard.

Mannequins equipped with sensors are standing in for astronauts on the mission and will record acceleration, vibration and radiation levels.

The next mission, Artemis 2, will take astronauts into orbit around the Moon without landing on its surface.

The crew of Artemis 3 is to land on the Moon in 2025 at the earliest.

O.Tse--ThChM