The China Mail - NASA scraps Tuesday Moon launch due to storm

USD -
AED 3.672952
AFN 64.499526
ALL 81.550227
AMD 361.43058
ANG 1.789785
AOA 918.000074
ARS 1513.143202
AUD 1.434309
AWG 1.8
AZN 1.697378
BAM 1.747405
BBD 2.013572
BDT 123.421934
BGN 1.747831
BHD 0.37766
BIF 2995
BMD 1
BND 1.282034
BOB 11.711836
BRL 5.038366
BSD 0.999772
BTN 95.182957
BWP 13.733399
BYN 3.020865
BYR 19600
BZD 2.010641
CAD 1.423345
CDF 2312.521651
CHF 0.835199
CLF 0.025036
CLP 985.360047
CNY 6.69275
CNH 6.696203
COP 3191.08
CRC 455.660238
CUC 1
CUP 23.993531
CVE 99.398678
CZK 21.845901
DJF 177.720161
DKK 6.703296
DOP 61.249821
DZD 134.726038
EGP 53.069699
ERN 15
ETB 161.12974
EUR 0.89675
FJD 2.26455
FKP 0.754659
GBP 0.75801
GEL 2.606343
GGP 0.754659
GHS 11.665039
GIP 0.754659
GMD 74.000399
GNF 8800.000137
GTQ 7.639869
GYD 209.069102
HKD 7.84789
HNL 26.950058
HRK 6.753703
HTG 130.910423
HUF 326.39401
IDR 17942.55
ILS 3.097603
IMP 0.754659
INR 95.11115
IQD 1513
IRR 1790500.000283
ISK 122.309516
JEP 0.754659
JMD 158.765613
JOD 0.709024
JPY 158.330193
KES 129.750075
KGS 87.449777
KHR 4071.999848
KMF 441.999909
KPW 899.999961
KRW 1341.460093
KWD 0.31184
KYD 0.833099
KZT 451.695332
LAK 22499.999681
LBP 89550.00018
LKR 330.891222
LRD 170.750221
LSL 16.489893
LTL 2.95274
LVL 0.60489
LYD 6.430071
MAD 9.746975
MDL 17.89398
MGA 4500.000066
MKD 55.018986
MMK 2100.02843
MNT 3599.679138
MOP 8.081626
MRU 40.220023
MUR 47.610272
MVR 15.45966
MWK 1742.000393
MXN 18.51695
MYR 4.0837
MZN 63.910163
NAD 16.489878
NGN 1329.930455
NIO 36.850223
NOK 9.515815
NPR 152.293053
NZD 1.784765
OMR 0.384397
PAB 0.999736
PEN 3.430503
PGK 4.45175
PHP 62.884948
PKR 277.034981
PLN 3.920895
PYG 5704.585558
QAR 3.6402
RON 4.784801
RSD 105.30495
RUB 83.610222
RWF 1475
SAR 3.74237
SBD 8.078071
SCR 14.136778
SDG 601.500902
SEK 10.037125
SGD 1.285801
SHP 0.754518
SLE 24.670284
SLL 20969.504398
SOS 571.503444
SRD 37.712039
STD 20697.981008
STN 21.975
SVC 8.747783
SYP 13001.999685
SZL 16.489741
THB 33.639809
TJS 9.227237
TMT 3.5
TND 3.303499
TOP 2.40776
TRY 49.413403
TTD 6.799166
TWD 32.214195
TZS 2630.868006
UAH 44.933885
UGX 4039.293995
UYU 40.187267
UZS 11951.498398
VES 875.701602
VND 25897
VUV 119.372685
WST 2.788609
XAF 588.229566
XAG 0.017972
XAU 0.000243580438
XCD 2.70255
XCG 1.801832
XDR 0.707052
XOF 588.229566
XPF 106.874968
YER 236.197532
ZAR 16.620701
ZMK 9001.197547
ZMW 19.868757
ZWL 321.999592
SSP 5748.524006
MXV 2.090995
  • RYCEF

    0.4000

    19.71

    +2.03%

  • CMSC

    0.0000

    20.4

    0%

  • BTI

    0.4200

    56.05

    +0.75%

  • BP

    0.2800

    44.43

    +0.63%

  • RBGPF

    1.6000

    67

    +2.39%

  • RIO

    -0.1500

    94.41

    -0.16%

  • AZN

    -0.4300

    166.15

    -0.26%

  • GSK

    0.4600

    49.7

    +0.93%

  • BCE

    -0.4100

    20.56

    -1.99%

  • NGG

    -0.2500

    75.24

    -0.33%

  • VOD

    -0.0400

    16.58

    -0.24%

  • RELX

    -0.4500

    33.07

    -1.36%

  • BCC

    -0.5500

    76.59

    -0.72%

  • CMSD

    -0.0300

    20.27

    -0.15%

  • JRI

    -0.2500

    10.77

    -2.32%

NASA scraps Tuesday Moon launch due to storm
NASA scraps Tuesday Moon launch due to storm / Photo: © AFP/File

NASA scraps Tuesday Moon launch due to storm

NASA has called off the scheduled Tuesday launch of its historic uncrewed mission to the Moon due to a tropical storm that is forecast to strengthen as it approaches Florida.

Text size:

After two previously canceled launch attempts, NASA is weighing returning the Artemis 1 mission rocket to its assembly site under the threat of extreme weather.

"NASA is forgoing a launch opportunity... and preparing for rollback (from the launchpad), while continuing to watch the weather forecast associated with Tropical Storm Ian," it said on Saturday.

The US National Hurricane Center (NHC) said Ian is due to "rapidly intensify" over the weekend as it moves toward Florida, home to the Kennedy Space Center, from which the rocket is set to launch.

Currently south of Jamaica, the storm is expected to approach Florida's west coast "at or near major hurricane strength" early next week, threatening storm surge, flooding and hurricane-force winds across much of the state, the NHC said.

On the launchpad, the giant orange and white Space Launch System (SLS) rocket can withstand wind gusts of up to 137 kilometers (85 miles) per hour. But if it has to be sheltered, the current launch window, which runs until October 4, will be missed.

A decision on whether to roll back the rocket to the Vehicle Assembly Building is due to be taken by the Artemis 1 team on Sunday, "to allow for additional data gathering and analysis," with the operation, if necessary, starting late Sunday or Monday morning, NASA said.

Jim Free, associate administrator for the agency's exploration systems development directorate, said on Twitter that a "step-wise approach" to the decision to roll back preserves "a launch opportunity if conditions improve," indicating a launch date before October 5 was still on the table.

If not, the next launch window will run from October 17 to 31, with one possibility of take-off per day, except from October 24-26 and 28.

The Artemis 1 space mission hopes to test the SLS as well as the unmanned Orion capsule that sits atop it, in preparation for future Moon-bound journeys with humans aboard.

Artemis is named after the twin sister of the Greek god Apollo, after whom the first Moon missions were named.

Unlike the Apollo missions, which sent only white men to the Moon between 1969 and 1972, Artemis missions will see the first person of color and the first woman step foot on the lunar surface.

A successful Artemis 1 mission would come as a huge relief to the US space agency, after years of delays and cost overruns.

But another setback would be a blow to NASA, after two previous launch attempts were scrapped when the rocket experienced technical glitches including a fuel leak.

The cost of the Artemis program is estimated to reach $93 billion by 2025, with its first four missions clocking in at a whopping $4.1 billion each, according to a government audit.

J.Thompson--ThChM