The China Mail - NASA sticks to plan to launch Moon rocket Wednesday

USD -
AED 3.672501
AFN 64.485622
ALL 81.549749
AMD 361.430444
ANG 1.789785
AOA 917.99947
ARS 1513.248302
AUD 1.433795
AWG 1.8
AZN 1.701095
BAM 1.747405
BBD 2.013572
BDT 123.421934
BGN 1.747831
BHD 0.37766
BIF 2995
BMD 1
BND 1.282034
BOB 11.711836
BRL 5.041198
BSD 0.999772
BTN 95.182957
BWP 13.733399
BYN 3.020865
BYR 19600
BZD 2.010641
CAD 1.421365
CDF 2312.520298
CHF 0.83205
CLF 0.025036
CLP 985.36034
CNY 6.69275
CNH 6.693545
COP 3196.93
CRC 455.660238
CUC 1
CUP 23.993531
CVE 99.404736
CZK 21.771992
DJF 177.719961
DKK 6.68041
DOP 61.249753
DZD 134.533389
EGP 53.067426
ERN 15
ETB 161.130477
EUR 0.89371
FJD 2.26455
FKP 0.754659
GBP 0.756045
GEL 2.597547
GGP 0.754659
GHS 11.664996
GIP 0.754659
GMD 73.999665
GNF 8799.999943
GTQ 7.639869
GYD 209.069102
HKD 7.847785
HNL 26.95013
HRK 6.732599
HTG 130.910423
HUF 325.206958
IDR 17930.35
ILS 3.097596
IMP 0.754659
INR 95.15175
IQD 1513
IRR 1790499.999928
ISK 121.920114
JEP 0.754659
JMD 158.765613
JOD 0.70898
JPY 157.930248
KES 129.779826
KGS 87.450163
KHR 4071.99991
KMF 441.999636
KPW 899.999961
KRW 1341.910271
KWD 0.31165
KYD 0.833099
KZT 451.695332
LAK 22499.999977
LBP 89549.99985
LKR 330.891222
LRD 170.749848
LSL 16.490129
LTL 2.95274
LVL 0.60489
LYD 6.429535
MAD 9.747029
MDL 17.89398
MGA 4499.999495
MKD 55.199462
MMK 2100.02843
MNT 3599.679138
MOP 8.081626
MRU 40.220079
MUR 47.610274
MVR 15.459906
MWK 1741.999788
MXN 18.473045
MYR 4.084099
MZN 63.910111
NAD 16.489766
NGN 1330.050088
NIO 36.849829
NOK 9.49815
NPR 152.293053
NZD 1.784099
OMR 0.384484
PAB 0.999736
PEN 3.430498
PGK 4.45175
PHP 62.907991
PKR 277.035036
PLN 3.906445
PYG 5704.585558
QAR 3.640169
RON 4.768703
RSD 104.962028
RUB 83.624996
RWF 1475
SAR 3.74237
SBD 8.078071
SCR 13.936404
SDG 601.497355
SEK 9.988495
SGD 1.28391
SHP 0.754518
SLE 24.669916
SLL 20969.504398
SOS 571.501784
SRD 37.711972
STD 20697.981008
STN 21.975
SVC 8.747783
SYP 13001.999685
SZL 16.490294
THB 33.633008
TJS 9.227237
TMT 3.5
TND 3.3035
TOP 2.40776
TRY 49.414402
TTD 6.799166
TWD 32.203098
TZS 2630.002993
UAH 44.933885
UGX 4039.293995
UYU 40.187267
UZS 11951.499896
VES 875.701604
VND 25897
VUV 119.372685
WST 2.788609
XAF 586.235332
XAG 0.01792
XAU 0.000242805963
XCD 2.70255
XCG 1.801832
XDR 0.707052
XOF 586.235332
XPF 106.874987
YER 236.200463
ZAR 16.58286
ZMK 9001.197676
ZMW 19.868757
ZWL 321.999592
SSP 5748.524006
MXV 2.086037
  • RYCEF

    0.4000

    19.71

    +2.03%

  • CMSC

    0.0000

    20.4

    0%

  • BTI

    0.4200

    56.05

    +0.75%

  • BP

    0.2800

    44.43

    +0.63%

  • RBGPF

    1.6000

    67

    +2.39%

  • RIO

    -0.1500

    94.41

    -0.16%

  • AZN

    -0.4300

    166.15

    -0.26%

  • GSK

    0.4600

    49.7

    +0.93%

  • BCE

    -0.4100

    20.56

    -1.99%

  • NGG

    -0.2500

    75.24

    -0.33%

  • VOD

    -0.0400

    16.58

    -0.24%

  • RELX

    -0.4500

    33.07

    -1.36%

  • BCC

    -0.5500

    76.59

    -0.72%

  • CMSD

    -0.0300

    20.27

    -0.15%

  • JRI

    -0.2500

    10.77

    -2.32%

NASA sticks to plan to launch Moon rocket Wednesday
NASA sticks to plan to launch Moon rocket Wednesday / Photo: © AFP/File

NASA sticks to plan to launch Moon rocket Wednesday

NASA said Friday it plans to attempt its long-delayed uncrewed mission to the Moon as scheduled next Wednesday, after inspections revealed only minor damage from Hurricane Nicole's passage through Florida.

Text size:

Jim Free, a senior official at the US space agency, told journalists there was "nothing preventing" a launch on that date, and said that NASA teams had managed to access the launch pad on Thursday.

The launch of the heavy lift rocket, the most powerful ever built by contractors for NASA, is now due to take place at 01:04am local time (0604 GMT) on Wednesday, with a possible launch window of two hours.

The uncrewed mission, dubbed Artemis 1, will bring the United States a step closer to returning astronauts to the Moon five decades after humans last walked on the lunar surface.

The rocket will propel the empty Orion crew capsule to the Moon, without landing on its surface. If the launch takes place as planned, the mission will last 25-and-a-half days before the capsule returns on December 11 with splashdown in the Pacific Ocean.

However, the US space agency has "some work to do" before the launch, said Free, such as powering up the vehicle and carrying out some technical tests.

One element on the base of the rocket, which may have been damaged, may need to be replaced.

The highly anticipated launch has already been delayed three times in as many months.

Free, who is NASA's associate administrator for exploration systems development, said two back-up launch dates have been set for November 19 and November 25, if necessary.

Winds from Hurricane Nicole, a category 1 storm, battered the rocket as it stood on its launch pad at the Kennedy Space Center. However, the wind speeds did not surpass the limits the vehicle can withstand, said Free.

However, he conceded that if NASA had known the hurricane was approaching, the SLS rocket would have been left in the vehicle assembly building.

The rocket was returned to the building in September to protect it from Hurricane Ian, but was taken back out to the launch pad just days before Nicole arrived.

Artemis 1 will mark the launch of the flagship Artemis program, which is aimed at taking the first woman and the first person of color to the Moon, by 2025, at the earliest.

NASA wants to establish a lasting human presence on the Moon, including the construction of a space station in orbit around the Moon. This is seen as a step that could lead to the first trip to Mars.

Z.Huang--ThChM