The China Mail - NASA sticks to plan to launch Moon rocket Wednesday

USD -
AED 3.672501
AFN 64.498808
ALL 81.039781
AMD 377.510312
ANG 1.79008
AOA 916.999994
ARS 1404.499139
AUD 1.404494
AWG 1.8
AZN 1.687314
BAM 1.642722
BBD 2.014547
BDT 122.351617
BGN 1.67937
BHD 0.377025
BIF 2955
BMD 1
BND 1.262741
BOB 6.911728
BRL 5.200898
BSD 1.000176
BTN 90.647035
BWP 13.104482
BYN 2.868926
BYR 19600
BZD 2.011608
CAD 1.35844
CDF 2225.000269
CHF 0.771425
CLF 0.021644
CLP 854.639905
CNY 6.91325
CNH 6.90663
COP 3671.28
CRC 494.712705
CUC 1
CUP 26.5
CVE 92.897402
CZK 20.43085
DJF 177.71998
DKK 6.2955
DOP 62.625003
DZD 129.582328
EGP 46.776799
ERN 15
ETB 155.050186
EUR 0.84264
FJD 2.18635
FKP 0.731875
GBP 0.73435
GEL 2.69028
GGP 0.731875
GHS 11.005005
GIP 0.731875
GMD 73.501046
GNF 8779.999882
GTQ 7.671019
GYD 209.257595
HKD 7.81621
HNL 26.505002
HRK 6.344696
HTG 131.086819
HUF 319.663499
IDR 16800.45
ILS 3.077095
IMP 0.731875
INR 90.73605
IQD 1310.5
IRR 42125.000158
ISK 122.359394
JEP 0.731875
JMD 156.494496
JOD 0.709003
JPY 153.421964
KES 128.999894
KGS 87.450398
KHR 4029.999687
KMF 414.999797
KPW 899.999067
KRW 1449.960032
KWD 0.30697
KYD 0.83354
KZT 493.505294
LAK 21445.000286
LBP 89733.661066
LKR 309.394121
LRD 186.550374
LSL 15.860192
LTL 2.95274
LVL 0.60489
LYD 6.288836
MAD 9.13875
MDL 16.898415
MGA 4430.000238
MKD 51.915295
MMK 2099.913606
MNT 3568.190929
MOP 8.053234
MRU 39.905058
MUR 45.679983
MVR 15.4599
MWK 1736.505582
MXN 17.206096
MYR 3.915502
MZN 63.8841
NAD 15.960196
NGN 1351.579862
NIO 36.714983
NOK 9.49152
NPR 145.034815
NZD 1.654135
OMR 0.384495
PAB 1.000181
PEN 3.354986
PGK 4.183501
PHP 58.284977
PKR 279.587483
PLN 3.552305
PYG 6605.156289
QAR 3.64125
RON 4.289598
RSD 98.889046
RUB 77.10069
RWF 1452.5
SAR 3.750395
SBD 8.048395
SCR 13.767722
SDG 601.502932
SEK 8.901904
SGD 1.262605
SHP 0.750259
SLE 24.249903
SLL 20969.499267
SOS 571.510487
SRD 37.77701
STD 20697.981008
STN 20.95
SVC 8.752
SYP 11059.574895
SZL 15.85973
THB 31.110186
TJS 9.391982
TMT 3.5
TND 2.83525
TOP 2.40776
TRY 43.637199
TTD 6.783192
TWD 31.350903
TZS 2590.154015
UAH 43.034895
UGX 3536.076803
UYU 38.350895
UZS 12300.000058
VES 388.253525
VND 26000
VUV 119.366255
WST 2.707053
XAF 550.953523
XAG 0.012153
XAU 0.000198
XCD 2.70255
XCG 1.802643
XDR 0.685659
XOF 549.506089
XPF 100.749968
YER 238.406014
ZAR 15.880545
ZMK 9001.202368
ZMW 19.029301
ZWL 321.999592
  • RBGPF

    0.1000

    82.5

    +0.12%

  • BCE

    -0.1800

    25.65

    -0.7%

  • CMSD

    -0.0100

    24.07

    -0.04%

  • BCC

    -0.3200

    89.41

    -0.36%

  • RIO

    2.2800

    99.52

    +2.29%

  • NGG

    1.8800

    90.64

    +2.07%

  • GSK

    -0.3300

    58.49

    -0.56%

  • CMSC

    0.0084

    23.7

    +0.04%

  • VOD

    0.4300

    15.68

    +2.74%

  • RELX

    -1.5600

    27.73

    -5.63%

  • RYCEF

    -0.4800

    16.93

    -2.84%

  • JRI

    0.3500

    13.13

    +2.67%

  • BTI

    0.1400

    60.33

    +0.23%

  • AZN

    11.3600

    204.76

    +5.55%

  • BP

    1.5800

    38.55

    +4.1%

NASA sticks to plan to launch Moon rocket Wednesday
NASA sticks to plan to launch Moon rocket Wednesday / Photo: © AFP/File

NASA sticks to plan to launch Moon rocket Wednesday

NASA said Friday it plans to attempt its long-delayed uncrewed mission to the Moon as scheduled next Wednesday, after inspections revealed only minor damage from Hurricane Nicole's passage through Florida.

Text size:

Jim Free, a senior official at the US space agency, told journalists there was "nothing preventing" a launch on that date, and said that NASA teams had managed to access the launch pad on Thursday.

The launch of the heavy lift rocket, the most powerful ever built by contractors for NASA, is now due to take place at 01:04am local time (0604 GMT) on Wednesday, with a possible launch window of two hours.

The uncrewed mission, dubbed Artemis 1, will bring the United States a step closer to returning astronauts to the Moon five decades after humans last walked on the lunar surface.

The rocket will propel the empty Orion crew capsule to the Moon, without landing on its surface. If the launch takes place as planned, the mission will last 25-and-a-half days before the capsule returns on December 11 with splashdown in the Pacific Ocean.

However, the US space agency has "some work to do" before the launch, said Free, such as powering up the vehicle and carrying out some technical tests.

One element on the base of the rocket, which may have been damaged, may need to be replaced.

The highly anticipated launch has already been delayed three times in as many months.

Free, who is NASA's associate administrator for exploration systems development, said two back-up launch dates have been set for November 19 and November 25, if necessary.

Winds from Hurricane Nicole, a category 1 storm, battered the rocket as it stood on its launch pad at the Kennedy Space Center. However, the wind speeds did not surpass the limits the vehicle can withstand, said Free.

However, he conceded that if NASA had known the hurricane was approaching, the SLS rocket would have been left in the vehicle assembly building.

The rocket was returned to the building in September to protect it from Hurricane Ian, but was taken back out to the launch pad just days before Nicole arrived.

Artemis 1 will mark the launch of the flagship Artemis program, which is aimed at taking the first woman and the first person of color to the Moon, by 2025, at the earliest.

NASA wants to establish a lasting human presence on the Moon, including the construction of a space station in orbit around the Moon. This is seen as a step that could lead to the first trip to Mars.

Z.Huang--ThChM