The China Mail - Sun Peak Metals to Continue Next Phase of Work on the Shire Copper-Gold VMS Project

USD -
AED 3.673102
AFN 62.999911
ALL 81.549637
AMD 371.400631
ANG 1.789884
AOA 918.000328
ARS 1404.690101
AUD 1.391972
AWG 1.80125
AZN 1.700959
BAM 1.672231
BBD 2.013706
BDT 122.949593
BGN 1.668102
BHD 0.377247
BIF 2975
BMD 1
BND 1.276607
BOB 6.908463
BRL 5.00125
BSD 0.999756
BTN 94.471971
BWP 13.52189
BYN 2.82083
BYR 19600
BZD 2.010807
CAD 1.367769
CDF 2322.501104
CHF 0.789201
CLF 0.022643
CLP 891.189773
CNY 6.83745
CNH 6.83866
COP 3610.92
CRC 454.776694
CUC 1
CUP 26.5
CVE 94.403662
CZK 20.803045
DJF 177.719945
DKK 6.379296
DOP 59.249817
DZD 132.487026
EGP 52.821501
ERN 15
ETB 157.374948
EUR 0.853599
FJD 2.21975
FKP 0.737964
GBP 0.739845
GEL 2.695017
GGP 0.737964
GHS 11.13974
GIP 0.737964
GMD 73.500338
GNF 8777.502481
GTQ 7.638607
GYD 209.169998
HKD 7.836655
HNL 26.620441
HRK 6.431989
HTG 130.969532
HUF 310.533499
IDR 17247
ILS 2.95602
IMP 0.737964
INR 94.60835
IQD 1310
IRR 1315999.999745
ISK 122.239636
JEP 0.737964
JMD 157.527307
JOD 0.708974
JPY 159.554498
KES 129.100507
KGS 87.429602
KHR 4010.000138
KMF 421.000187
KPW 899.995813
KRW 1472.103834
KWD 0.30756
KYD 0.833202
KZT 458.273661
LAK 21944.999934
LBP 89599.999968
LKR 318.685688
LRD 183.750231
LSL 16.535001
LTL 2.95274
LVL 0.60489
LYD 6.345024
MAD 9.25625
MDL 17.291603
MGA 4149.000162
MKD 52.641693
MMK 2100.039346
MNT 3596.354975
MOP 8.070247
MRU 39.999727
MUR 46.779919
MVR 15.450593
MWK 1741.000009
MXN 17.387315
MYR 3.952498
MZN 63.909973
NAD 16.550393
NGN 1370.169702
NIO 36.714991
NOK 9.316145
NPR 151.155324
NZD 1.698615
OMR 0.38448
PAB 0.999761
PEN 3.504747
PGK 4.34475
PHP 61.091979
PKR 278.626715
PLN 3.62728
PYG 6267.180239
QAR 3.643249
RON 4.351198
RSD 100.231011
RUB 75.32596
RWF 1460.5
SAR 3.750982
SBD 8.025935
SCR 14.004808
SDG 600.502842
SEK 9.27194
SGD 1.276335
SHP 0.746601
SLE 24.62499
SLL 20969.496166
SOS 571.501661
SRD 37.464976
STD 20697.981008
STN 21.25
SVC 8.748402
SYP 110.549271
SZL 16.549972
THB 32.499259
TJS 9.378107
TMT 3.505
TND 2.88375
TOP 2.40776
TRY 45.040101
TTD 6.798138
TWD 31.530499
TZS 2607.622964
UAH 44.060757
UGX 3719.267945
UYU 39.45844
UZS 12070.000014
VES 484.618565
VND 26348
VUV 118.225603
WST 2.727813
XAF 560.845941
XAG 0.013644
XAU 0.000218
XCD 2.70255
XCG 1.801836
XDR 0.697718
XOF 559.449932
XPF 102.224976
YER 238.650158
ZAR 16.542855
ZMK 9001.195095
ZMW 18.969203
ZWL 321.999592
  • RBGPF

    0.0000

    64

    0%

  • RYCEF

    -0.2000

    15.2

    -1.32%

  • NGG

    0.2450

    87.475

    +0.28%

  • VOD

    -0.0050

    15.505

    -0.03%

  • RIO

    -1.0300

    98.92

    -1.04%

  • CMSC

    -0.0600

    22.8

    -0.26%

  • BTI

    0.9230

    58.243

    +1.58%

  • BCE

    -0.0850

    23.475

    -0.36%

  • GSK

    0.1630

    54.383

    +0.3%

  • RELX

    -0.3250

    36.065

    -0.9%

  • AZN

    -1.5200

    185.99

    -0.82%

  • BCC

    -0.6000

    83.26

    -0.72%

  • CMSD

    -0.0600

    23.2

    -0.26%

  • JRI

    -0.0600

    12.77

    -0.47%

  • BP

    0.4650

    46.435

    +1%

Sun Peak Metals to Continue Next Phase of Work on the Shire Copper-Gold VMS Project
Sun Peak Metals to Continue Next Phase of Work on the Shire Copper-Gold VMS Project

Sun Peak Metals to Continue Next Phase of Work on the Shire Copper-Gold VMS Project

Sun Peak Metals Corp. (the "Company" or "Sun Peak") (TSXV:PEAK)(OTCQB:SUNPF) is pleased to provide an update on its Shire Project in Ethiopia, highlighting recent exploration results and outlining key targets for its 2025 drilling program.

Text size:

Greg Davis, President and CEO commented, "We are excited to advance exploration on the Shire Project, particularly at the Meli and Anguda North trends. Our recent mapping and surveying efforts have revealed significant new targets that reinforce the Shire Project's exceptional copper-gold potential. As we prepare to launch drilling in early 2025, we remain focused on unlocking the value of this promising VMS system."

Key Highlights of the Shire Project

  • 2025 Exploration Program:

  • Drilling to commence in Q1 at the Meli Trend and the Anguda North Target.

  • Detailed Ground Deep Time Domain Electromagnetic (DTEM) surveys scheduled for January to refine drill location targeting.

  • Proven VMS Belt:

  • Located in a district-scale VMS belt with high-priority copper-gold targets.

  • Previous Sun Peak drilling has intercepted significant copper-gold mineralization at the Meli, Argo, and Keel targets - all remain open for expansion. Intercepts include:

Meli

ML-001 - 15.30m @ 3.18 g/t Au, 25.0 g/t Ag and 2.2% Cu
ML-002 - 37.23m @ 2.45 g/t Au, 29.4 g/t Ag and 2.4% Cu
ML-003 - 35.43m @ 2.52 g/t Au, 22.3 g/t Ag and 1.8% Cu

Keel

KL-006 - 17.85m @ 3.95 g/t Au, 45.5g/t Ag, 1.4% Cu, and 1.6% Zn

Argo

AR-001 - 6.57m @ 1.34 g/t Au, 54.3g/t Ag, 6.3% Cu, and 1.7% Zn

  • All targets drilled by Sun Peak to date have intercepted VMS style mineralization, confirming the effectiveness of the team's exploration methodology.

  • Numerous new high-quality targets are currently being developed showing strong copper and gold potential.

2025 Exploration

The exploration team has been conducting extensive detailed geological mapping and prospecting in the field as part of the Company's preparations for the upcoming drilling program on the Shire Project, which will target the Meli Trend and Anguda North.

Ground Deep Electromagnetic Time Domain ("DTEM") surveys on both the Meli Trend and Anguda North targets will begin in early January and drilling is planned to begin late January. The results from the DTEM work will be used to enhance targeting drill locations.

Figure 1: Map of Shire Project exploration licenses and key targets

Meli VMS Trend

Exploration work at Meli has primarily focused on a greater than 3km long, east-west oriented VMS trend, containing targets such as Meli Main, Meli Central, and Meli Far-West (Figure 2). The trend is anchored at each end by strong gold and copper drill intercepts (Meli Main and Meli Far West), which are part of an extensive VMS system containing intermittent gossans and hydrothermally altered zones. Detailed gravity surveys have revealed strong anomalies and are largely untested by diamond drilling. These strong anomalies will be a key focus of the upcoming drill program.

Figure 2: Key VMS Targets on the Meli License

Meli Main Target

The Meli Main Target is located at the east end of the Meli trend and has been the focus of previous successful drill programs by the Company, resulting in some of the best copper-gold VMS intercepts on the Project. The target includes an area of massive sulphides below an exposed 600m long gold-rich VMS gossan (some of which has been mined to a depth of averaging 20 meters), with additional intermittent gossans along trend to the east and west.

Drilling by the Company at Meli Main in 2020 demonstrated the potential of the Meli trend. Highlights from the 2020 drilling at Meli include (full results in table at end of this news release):

  • ML-002 - 37.23m @ 2.45g/t Au, 29.4g/t Ag, 2.4% Cu, and 1.3% Zn

  • ML-003 - 35.43m @ 2.52g/t Au, 22.3g/t Ag, 1.8% Cu, and 1.5% Zn

  • ML-013 - 8.89m @ 2.76g/t Au, 31.8g/t Ag, 2.22% Cu, and 1.75% Zn

  • ML-014 - 11.48m @ 3.57g/t Au, 31.2g/t Ag, 2.38% Cu, and 0.65% Zn

  • ML-018 - 9.61m @ 3.18g/t Au, 32.3g/t Ag, 2.21% Cu, and 0.56% Zn

The Meli Main Target remains open to depth and along trend.

Meli Central

The large Meli Central Target has a very strong gravity anomaly located within the Meli VMS Trend. The target is untested, and the signature of the gravity anomaly has strong similarities in size and magnitude to the signatures from the Emba Derho and Bisha VMS Deposits in the same region.

The target is located only 2 kilometers west of Meli Main and the trend is defined by smaller gravity anomalies along the trend over known mineralization.

Meli Far-West Target

The Meli Far-West Target is located approximately 3 km west of Meli Main within the Meli VMS trend. In November 2020, two shallow drill holes for a total of 108 meters, were drilled at the target and designed to test the gold oxide gossan. MW-001 intercepted 15.84 meters averaging 1.90 g/t gold.

Drilling confirms the presence of significant gold mineralization in the gossan and demonstrates the potential for the Meli Far-West Target to host gold and copper VMS sulphide below the gossan. The mineralization is open to depth and along strike, and future drilling at the Meli Far-West target will test the massive sulfide potential beneath the gossan.

Anguda VMS System/Trend

The Anguda VMS Trend, situated within the Terer exploration license, is a prominent VMS system extending for over 10 kilometers. Key targets along this trend include the Anguda North Target, Anguda Main Target, Anguda Main (N), Anguda Southern Limb Target, and the Terer VMS Target (Figure 3).

Recent drilling activities at the Hamlo and Terer VMS Targets, alongside limited drilling at the Anguda Southern Limb in 2020, have revealed typical VMS metal zoning patterns - see Sun Peak news release, dated July 25, 2024. The data suggests a potential increase in precious and base metal concentrations in other VMS zones within the Anguda trend.

The drill results at the Terer Target, outlined a VMS system along the trend of the Anguda North gravity high anomaly located approximately 2 kilometers east. Final drill results from Hamlo and Terer drilling can be found in table at the end of this release.

Anguda North VMS Target: Defined by a strong soil geochemistry anomaly, detailed ground gravity high anomalies, airborne VTEM conductor, and 800 meters long gossan outcrops. The gossan outcrops were defined in recent geological mapping work which was following up on the anomalies identified by the geophysical and geochemistry surveys.

Ground DTEM survey is scheduled in Q1 2025 which will be immediately followed by drilling at Anguda North.

Anguda Main (N) VMS Target: Defined by a greater than 1.5-kilometer-long mineralized zone of gossans and hydrothermal alteration horizons, plunging and increasing in size to the east. The target is identified by a copper and zinc soil geochemistry anomaly and a gravity high coincident with VTEM conductors.

The upcoming work program in Q1 2025 will include ground DTEM surveys over the Anguda North and Anguda Main Targets, with drilling to follow.

Figure 3: Anguda regional VMS trends underlain by gravity surveys and soil geochemistry

High Priority Targets

The main focus of the upcoming drill program in early 2025 will begin with the Meli Trend and the Anguda North Target, however exploration work will also include other high priority targets throughout the year. A summary of these other key targets is as follows.

Keel and Argo VMS Trend

The Keel and Argo Targets are part of a significant VMS system that extends over 6 kilometers and includes several other highly prospective targets such as the Northwest Zone (Figure 4).

During the Company's initial drill program in 2020, Sun Peak drilled 12 holes and intercepted high-grade copper-gold VMS mineralization at both Keel and Argo targets. The VMS zones remain open in all directions with untested gossans and gravity anomalies directly on strike from Keel and Argo.

Future work will focus on extending these zones laterally and testing new zones along the trend.

Figure 4: Keel-Argo VMS Trend

Meda VMS Target: Defined by a 1.2 kilometers long gold, silver, copper, and zinc soil geochemistry anomaly, several gossan outcrops, and a gravity high anomaly. A single historic vertical RC hole was drilled in 2004 into the gossan which assayed 18 meters of 2.77 g/t gold from surface (Figure 5).

Future drilling will attempt to define the VMS Zone laterally along strike and to depth.

Figure 5: Meda VMS target underlain by geology

Target Development Work

Sun Peak's Shire Project has approximately two dozen VMS and gold prospects currently being developed by the Company. The Sun Peak exploration team has been in the field in Q4 2024 to follow-up on some of these prospects including prospecting, sampling, and detailed and structural mapping. The Sun Peak team is encouraged by the findings and several of these prospects showing strong potential for VMS and gold drill targets. The Company will provide further details of these "pipeline" targets in a subsequent news release in the new year.

Drill Results Summary

The following table summarizes all Sun Peak drill results since 2020 on the Shire Project over 7 targets.

Meli Main (2020)

Date Reported

Hole ID

From

To

Interval

Au (g/t)

Ag (g/t)

Cu (%)

Zn (%)

ML-001

7.86

17.2

9.34

0.07

2.2

0.5

0.1

Aug 10, 2020

ML-001

55.6

70.9

15.3

3.18

25

2.2

1.4

Aug 10, 2020

ML-002

47.37

84.6

37.23

2.45

29.4

2.4

1.3

Aug 10, 2020

ML-003

87.74

123.17

35.43

2.52

22.3

1.8

1.5

Aug 10, 2020

ML-004

72.46

83.2

10.74

3.34

27.3

1.8

1

Aug 10, 2020

ML-005

90.26

101.25

10.99

3.01

26.8

1.8

0.8

Aug 10, 2020

ML-006

70.95

74.79

3.84

2.57

30.3

1.9

0.7

Aug 10, 2020

ML-007

18.05

23.3

5.25

3.3

2.3

Aug 10, 2020

ML-007

34.05

35.17

1.12

3.07

45.2

5.7

Aug 10, 2020

ML-007

39.32

40.82

1.5

1.19

12.9

0.1

Aug 10, 2020

ML-007

52.55

53.53

0.98

4.34

38.9

5.4

Aug 10, 2020

ML-007

61.03

63.32

2.29

2.97

24.2

1.5

0.65

Aug 10, 2020

ML-009

68.8

71.16

2.36

1.6

7.4

1.42

0.74

May 28, 2024

ML-010

13.65

17.5

3.85

0.01

1.9

0.66

0.1

May 28, 2024

ML-013

142.23

151.12

8.89

2.76

31.8

2.22

1.75

May 28, 2024

ML-014

162.6

174.08

11.48

3.57

31.2

2.38

0.65

May 28, 2024

ML-018

108.64

118.25

9.61

3.18

32.3

2.21

0.56

May 28, 2024

Meli Far West (2020)

Hole ID

From

To

Interval

Au (g/t)

Ag (g/t)

Cu (%)

Zn (%)

MW-001

5.5

21.34

15.84

1.9

10.7

0.04

0.01

May 28, 2024

including

5.5

7

1.5

2.34

0.6

0.04

May 28, 2024

including

11.05

21.34

10.26

2.51

15.6

0.036

0.01

May 28, 2024

including

11.05

18.6

7.55

2.94

16

0.04

0.01

May 28, 2024

Keel (2020)

Hole ID

From

To

Interval

Au (g/t)

Ag (g/t)

Cu (%)

Zn (%)

KL-001

52.78

58.7

5.92

5.01

176.2

Aug 10, 2020

KL-001

59.44

79.6

20.16

0.78

18.4

0.6

2.3

Aug 10, 2020

KL-002

100.25

133.91

33.66

0.92

22.6

0.9

2.7

Aug 10, 2020

KL-003

63.15

78.35

15.2

0.84

20.2

1.1

1.3

Aug 10, 2020

KL-004

113.13

122.05

8.9

0.58

16

0.4

Aug 10, 2020

KL-004

132.7

134.63

1.93

0.88

10.9

0.2

0.4

Aug 10, 2020

KL-005

106.71

110.36

3.65

3.11

23.2

0.6

0.8

Aug 10, 2020

KL-006

89.68

92.68

3

0.08

1.1

0.8

Aug 10, 2020

KL-006

160.45

178.3

17.85

3.95

45.5

1.4

1.6

Aug 10, 2020

Argo (2020)

Hole ID

From

To

Interval

Au (g/t)

Ag (g/t)

Cu (%)

Zn (%)

AR-001

7.62

10.67

3.05

1

16.9

0.2

0.3

Aug 10, 2020

AR-001

10.67

17.24

6.57

1.34

54.3

6.3

1.7

Aug 10, 2020

AR-002

64.05

69.66

5.61

1.04

25.7

1.2

5.2

Aug 10, 2020

AR-003

95.15

129.72

34.57

0.33

3.4

0.5

0.2

Aug 10, 2020

including

101.06

114.8

13.74

0.49

7.1

1.1

0.3

Aug 10, 2020

AR-004

86.24

111.85

25.61

0.82

14.2

1.2

2.4

Aug 10, 2020

including

86.24

100.44

14.2

1.07

23.9

1.7

4.2

Aug 10, 2020

AR-005

49.08

62.24

13.16

1.35

16.9

1.1

1.7

Aug 10, 2020

including

49.08

59.9

10.82

1.55

19.8

1.3

2

Aug 10, 2020

AR-006

44.76

64.58

19.82

0.63

15.9

0.4

2.5

Aug 10, 2020

including

44.76

51.58

6.82

0.68

25.3

0.6

4.6

Aug 10, 2020

Anguda Southern Limb (2020)

Hole ID

From

To

Interval

Au (g/t)

Ag (g/t)

Cu (%)

Zn (%)

AN-002

25.95

29.09

3.14

0.35

4.67

0.45

0.33

May 28, 2024

AN-003

44.07

46.23

2.16

0.27

3.5

0.5

1.22

May 28, 2024

AN-004

70.9

72.35

1.45

0.25

4.12

0.46

1.25

May 28, 2024

AN-006

63.75

66.75

3

0.21

3.33

0.48

0.64

May 28, 2024

AN-007

99.9

107.35

7.45

1.29

2.95

0.42

0.81

May 28, 2024

AN-008

42.51

44.06

1.55

0.54

2.49

0.02

0.53

May 28, 2024

AN-008

47.46

54.46

7

0.2

4.15

0.33

1.76

May 28, 2024

AN-009

63.46

67.23

3.77

0.22

4.46

0.27

1.59

May 28, 2024

AN-009

69

71.61

2.61

0.2

5.6

0.64

0.99

May 28, 2024

AN-010

99.06

99.36

0.3

1.12

8.8

0.03

1.54

May 28, 2024

AN-010

107.87

116.14

8.27

0.18

4.95

0.36

0.87

May 28, 2024

including

107.87

110.75

2.88

0.2

6.29

0.28

1.17

May 28, 2024

including

111.55

116.14

4.59

0.19

4.95

0.47

0.82

May 28, 2024

Terer Main (2024)

Hole ID

From

To

Interval

Au (g/t)

Ag (g/t)

Cu (%)

Zn (%)

TR-001

102.65

104.22

1.57

0.349

7.3

0.05

0.25

July 25, 2024

TR-001

119.02

120.35

1.33

0.177

3.9

0.14

0.6

July 25, 2024

TR-001

126.24

132.84

6.6

0.366

6.7

0.47

1.46

July 25, 2024

TR-002

168.65

169.66

1.01

0.634

9.2

0.32

1.32

July 25, 2024

TR-002

172.14

190.6

18.46

0.316

7.2

0.47

1.85

July 25, 2024

including

172.14

181.94

9.8

0.385

10.2

0.81

3.11

July 25, 2024

including

172.14

173.98

1.84

0.497

12.3

0.87

9.24

July 25, 2024

including

175.17

176.86

1.69

0.254

5.2

0.17

6.97

July 25, 2024

including

178.53

181.94

3.41

0.573

17.7

1.65

0.32

July 25, 2024

including

185

190.6

5.6

0.356

5.8

0.14

0.63

July 25, 2024

and

196.44

205.15

8.71

0.29

5.1

0.56

0.65

July 25, 2024

including

196.44

202.12

5.68

0.429

7.1

0.84

0.98

July 25, 2024

including

202.12

205.15

3.03

0.031

1.4

0.03

0.03

July 25, 2024

*TR-003

208.19

210.27

2.08

0.154

2.4

0.08

1.45

Dec 19, 2024

including

209.77

210.27

0.5

0.264

4.9

0.21

5.65

Dec 19, 2024

and

228.6

231.44

2.84

0.459

8.7

0.98

0.24

Dec 19, 2024

*TR-004

162.48

167.93

5.45

0.28

5

1.06

0.25

Dec 19, 2024

and

198

201.36

3.36

0.184

3.8

0.41

0.43

Dec 19, 2024

*TR-005

188.52

192.56

4.04

0.447

3.3

0.276

0.094

Dec 19, 2024

*TR-006

97.57

102.39

4.82

0.38

5.72

1.37

0.47

Dec 19, 2024

including

99.49

100.45

0.96

0.254

4.3

1.31

1.36

Dec 19, 2024

*TR-008

72.87

73.93

0.96

0.185

6.6

1.6

0.22

Dec 19, 2024

*TR-010

264.48

271

6.52

0.263

4.3

0.42

0.92

Dec 19, 2024

including

264.48

266.97

2.49

0.439

6.7

0.6

1.77

Dec 19, 2024

and

288.36

295.53

7.17

0.38

6.14

1.4

0.25

Dec 19, 2024

including

291.85

295.53

3.68

0.51

7.6

1.85

0.26

Dec 19, 2024

*TR-012

149.78

152.32

2.54

0.587

7.6

0.98

4

Dec 19, 2024

and

155.68

162.7

7.02

0.167

2.5

0.33

0.99

Dec 19, 2024

including

155.68

159.25

3.57

0.273

4.2

0.44

1.36

Dec 19,2024

and

169.6

178.9

9.3

0.24

4.88

0.86

0.94

Dec 19,2024

including

176.38

178.9

2.52

0.27

5.9

1.25

0.97

Dec 19,2024

Hamlo (2024)

Hole ID

From

To

Interval

Au (g/t)

Ag (g/t)

Cu (%)

Zn (%)

HM-002

0

23.3

23.3

0.137

1

0.029

July 25, 2024

HM-002

104.54

108.45

3.91

0.085

1.1

0.023

1.15

July 25, 2024

HM-003

197.11

209.86

12.75

0.155

0.9

0.13

0.41

July 25, 2024

HM-006

288.3

303.05

14.75

0.228

3.3

0.035

1.01

July 25, 2024

*HM-009

118.5

125.08

6.58

0.18

1.3

0.049

Dec 19, 2024

*HM-010

158.74

165.75

7.01

0.15

4.7

0.047

1.08

Dec 19, 2024

including

161.64

165.75

4.11

0.18

6.6

0.054

1.54

Dec 19, 2024

*HM-011

345.25

346.75

1.5

6.32

4.5

0.012

0.014

Dec 19, 2024

*HM-012

181.5

186

4.5

0.21

4.3

0.011

0.36

Dec 19, 2024

* New drill results from Terer and Hamlo Targets in this news release

No significant intercepts in the following holes:

Meli - ML-008, ML-011, ML-012, ML-015, ML-016, and ML-017, reported May 28, 2024

Meli Far West - MW-002, reported May 28, 2024

Anguda Southern Limb - AN-001 and AN-005, reported May 28, 2024

Terer - TR-007, TR-009, TR-011, new drill results reported in this news release

Hamlo - HM-001, reported July 25, 2024 and HM-008, new drill result reported in this news release

QUALIFIED PERSON'S STATEMENT

David K. Daoud, P. Geo, Vice President Exploration is the Qualified Person overseeing Sun Peak's exploration projects in Ethiopia and has reviewed and approved this press release.

All drill holes reported are diamond drill core holes.

A Quality Assurance/Quality Control program was part of the sampling program on the Hamlo and Terer prospects. This program includes the systematic submittals of standards, duplicates, and blank samples into the flow of samples produced by the sampling.

Samples were prepared at ALS Laboratory in Addis Ababa, Ethiopia and analyzed at ALS Laboratory in Dublin, Ireland. Gold is assayed using a 50-gram of -75 micron-size pulp is fire assayed and finished by ICP-AES analysis to detect content between 0.01 and 10.0 ppm. Gold returning over limit values are re-assayed with higher detection limits using a gravimetric finish. As well, a 0.5 gram cut from the pulp of each rock sample is dissolved by aqua regia acid digestion and analyzed by mass spectrometry for a suite of 51 additional elements. Analytical values for silver, copper, zinc, and lead over detection limits are re-assayed with higher detection limits, using aqua regia digestion. Drilling intercept lengths and estimated true thicknesses are reported in the tabulations.

ABOUT SUN PEAK METALS CORP.

Sun Peak is exploring the district-scale Shire VMS Project in the Tigray Region of northern Ethiopia. The Shire Project is comprised of six exploration licenses and covers approximately 1,450 square kilometers in the prospective Arabian Nubian Shield. The licenses are in the same geological environment as both the Bisha Mine and the Asmara Projects. The Meli and Terer Licenses are part of a joint-venture agreement with Ezana Mining, a private Ethiopian Company and the other four are 100% owned by Sun Peak. The Sun Peak team have worked in East Africa for more than two decades and the Company's strategy is to apply exploration techniques that have worked successfully in the region before, to build assets through major copper-gold VMS discoveries.

ON BEHALF OF THE BOARD OF DIRECTORS OF SUN PEAK METALS CORP.

Greg Davis,
President, CEO & Director

FOR FURTHER INFORMATION, PLEASE CONTACT:

Greg Davis
(T): +1 (604) 999 1099
(E): [email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Disclaimer for Forward-Looking Information

Certain information and statements in this news release may be considered forward-looking information or forward-looking statements for purposes of applicable securities laws (collectively, "forward-looking statements"), which reflect the expectations of management regarding its disclosure and amendments thereto. Forward-looking statements consist of information or statements that are not purely historical, including any information or statements regarding beliefs, plans, expectations or intentions regarding the future. Such information or statements may include, but are not limited to, statements with respect to the goal of making a significant discovery and the development of a large-scale project in Ethiopia and identifying other potential properties and opportunities both in Ethiopia and globally. Such statements are subject to risks and uncertainties that may cause actual results, performance or developments to differ materially from those contained in the statements. No assurance can be given that any of the events anticipated by the forward-looking statements will occur or, if they do occur, what benefits Sun Peak will obtain from them. These forward-looking statements reflect management's current views and are based on certain expectations, estimates and assumptions, which may prove to be incorrect. A number of risks and uncertainties could cause actual results to differ materially from those expressed or implied by the forward-looking statements, including without limitation: the risk that the results of the planned drilling and exploration programs at the Shire Project do not meet expected results. These forward-looking statements are made as of the date of this news release and, except as required by applicable securities laws, Sun Peak assumes no obligation to update these forward-looking statements, or to update the reasons why actual results differed from those projected in the forward-looking statements. Additional information about these and other assumptions, risks and uncertainties are set out in the "Risks and Uncertainties" section in the Prospectus filed with Canadian security regulators.

SOURCE: Sun Peak Metals Corp.

A.Sun--ThChM