The China Mail - Cerrado Gold Announces Q4 and Annual 2024 Gold Production Results for its Minera Don Nicolas Mine in Argentina

USD -
AED 3.672504
AFN 63.000368
ALL 83.700248
AMD 376.999869
ANG 1.790083
AOA 917.000367
ARS 1398.250402
AUD 1.43123
AWG 1.8
AZN 1.70397
BAM 1.705218
BBD 2.01395
BDT 122.699333
BGN 1.709309
BHD 0.377523
BIF 2968.481625
BMD 1
BND 1.279568
BOB 6.90963
BRL 5.330604
BSD 0.999956
BTN 92.298705
BWP 13.625703
BYN 2.958717
BYR 19600
BZD 2.010986
CAD 1.38085
CDF 2257.000362
CHF 0.793344
CLF 0.023229
CLP 917.210396
CNY 6.896604
CNH 6.90768
COP 3682.200619
CRC 470.465147
CUC 1
CUP 26.5
CVE 96.137582
CZK 21.430394
DJF 178.06356
DKK 6.545104
DOP 61.432495
DZD 132.63604
EGP 52.687563
ERN 15
ETB 156.082044
EUR 0.87204
FJD 2.228704
FKP 0.749032
GBP 0.752984
GEL 2.730391
GGP 0.749032
GHS 10.859235
GIP 0.749032
GMD 73.503851
GNF 8765.857274
GTQ 7.668163
GYD 209.198309
HKD 7.83085
HNL 26.46846
HRK 6.599604
HTG 131.112952
HUF 343.740388
IDR 16960.05
ILS 3.14434
IMP 0.749032
INR 92.58485
IQD 1309.908889
IRR 1321725.000352
ISK 126.303814
JEP 0.749032
JMD 156.894372
JOD 0.70904
JPY 159.72504
KES 129.334321
KGS 87.449704
KHR 4009.765029
KMF 431.00035
KPW 899.878965
KRW 1502.750383
KWD 0.30743
KYD 0.833253
KZT 489.524391
LAK 21426.391735
LBP 89542.177078
LKR 311.199268
LRD 182.980949
LSL 16.79428
LTL 2.95274
LVL 0.60489
LYD 6.3804
MAD 9.41776
MDL 17.443655
MGA 4151.881076
MKD 53.742535
MMK 2099.194294
MNT 3570.249458
MOP 8.06077
MRU 40.006975
MUR 46.510378
MVR 15.450378
MWK 1733.815772
MXN 17.950204
MYR 3.938504
MZN 63.910377
NAD 16.79428
NGN 1385.503725
NIO 36.793234
NOK 9.74622
NPR 147.677754
NZD 1.730553
OMR 0.387053
PAB 0.999869
PEN 3.448276
PGK 4.372466
PHP 59.590375
PKR 279.200663
PLN 3.74845
PYG 6451.022276
QAR 3.634858
RON 4.462604
RSD 102.332273
RUB 80.570208
RWF 1459.174332
SAR 3.752535
SBD 8.051718
SCR 15.162038
SDG 601.000339
SEK 9.480704
SGD 1.281504
SHP 0.750259
SLE 24.550371
SLL 20969.510825
SOS 570.469506
SRD 37.548038
STD 20697.981008
STN 21.361001
SVC 8.749292
SYP 111.636388
SZL 16.788875
THB 32.328038
TJS 9.584202
TMT 3.5
TND 2.957147
TOP 2.40776
TRY 44.165038
TTD 6.781464
TWD 32.194604
TZS 2604.734295
UAH 44.095122
UGX 3759.536161
UYU 40.1674
UZS 12073.760844
VES 442.704625
VND 26294
VUV 118.960301
WST 2.788339
XAF 571.914207
XAG 0.012417
XAU 0.000199
XCD 2.70255
XCG 1.802084
XDR 0.711278
XOF 571.914207
XPF 103.980121
YER 238.550363
ZAR 16.88291
ZMK 9001.203584
ZMW 19.462923
ZWL 321.999592
  • RBGPF

    0.1000

    82.5

    +0.12%

  • CMSC

    -0.1500

    22.99

    -0.65%

  • CMSD

    -0.1100

    22.99

    -0.48%

  • NGG

    0.0900

    90.9

    +0.1%

  • GSK

    -0.8900

    53.39

    -1.67%

  • BCE

    -0.1100

    25.57

    -0.43%

  • BTI

    0.0400

    59.93

    +0.07%

  • BP

    0.5100

    42.67

    +1.2%

  • RIO

    -2.8700

    87.83

    -3.27%

  • RELX

    -0.0400

    34.14

    -0.12%

  • BCC

    0.3800

    70

    +0.54%

  • VOD

    0.1000

    14.41

    +0.69%

  • JRI

    -0.2300

    12.59

    -1.83%

  • AZN

    -2.6000

    189.9

    -1.37%

  • RYCEF

    -1.1300

    16.12

    -7.01%

Cerrado Gold Announces Q4 and Annual 2024 Gold Production Results for its Minera Don Nicolas Mine in Argentina
Cerrado Gold Announces Q4 and Annual 2024 Gold Production Results for its Minera Don Nicolas Mine in Argentina

Cerrado Gold Announces Q4 and Annual 2024 Gold Production Results for its Minera Don Nicolas Mine in Argentina

(TSXV:CERT)(OTCQX:CRDOF) ("Cerrado" or the "Company") announces production results for the fourth quarter ended December, 2024 ("Q4 2024") from the Minera Don Nicolas Mine in Santa Cruz Province, Argentina ("MDN"). Full fourth quarter financial results are expected to be released prior to April 30, 2025.

Text size:

  • Annual Gold Equivalent Ounce ("GEO") Production of 54,494 GEO; in line with Guidance of 50,000 - 60,000 GEO.

  • Q4 Production of 10,431 GEO impacted by lower than planned ore grades from residual open pits.

  • Record Production of 5,956, GEO from Heap Leach operations during the quarter.

  • Received Asset Sale and Option payments totaling $34 MM during the quarter, significantly strengthening the balance sheet.

  • 2025 Production Guidance of between 50,000-55,000 GEO.

Q4 Operating Highlights

  • Q4 Production of 10,431 GEO vs 16,604 GEO in Q3.

  • Annual Sales of 51,694 GEO for 2024

  • Production impacted by lower than planned feed grade to the CIL plant during the quarter as mining of high-grade pits nears completion.

  • Studies to commence underground operations at Paloma in H2/25 initiated during the quarter.

  • Focus remains on ramping up crushing capacity at Calandrias Sur and bringing heap leach production up to 4,000- 4,500 GEO per month by March 2025.

While operational results for Q4 2024 demonstrated a decrease in production over the previous quarter, this was driven by lower than expected ore grades delivered from the final stages of mining of the older high grade open pits and stockpiles to feed the CIL plant as the Company's operations transition to a primarily heap leach operation in 2025. The heap leach operational performance continued to improve over the quarter, reaching record production levels as more ore was added to the pad. The performance of the heap leach continues to depend on the crushing circuit. An additional secondary crushing circuit is currently being installed to ensure excess capacity is in place to support the transition to a heap leach only facility. Once fully operational, the crushing capacity should allow for approximately 300,000 tonnes of ore to be placed on the pad per month. The installation of the secondary crusher is expected to reduce fleet and operating costs and is expected to operate at full capacity by the end of the 1st quarter, at which time the mobile crushers will be placed on stand by.

In addition, the company is undertaking detailed analysis and preparations for equipment sourcing with the view to commencing underground operations later this year beneath the Palmoa pit. While the initial production expectations are relatively modest given the current known underground resource, underground access is expected to provide a platform for major exploration activities at lower costs than drilling from surface with the aim to materially expand the resources available for underground development. Further details will be released once finalized and a development decision is made.

The Company provides 2025 annual production guidance of between 50,000 - 55,000 GEO at an ASIC of between $1,300 - $1,500 per GEO. The bulk of this production is expected to be delivered solely from heap leach operations from Q2/25 onwards .

Mont Sorcier Update

At the Mont Sorcier high purity iron project, detailed metallurgical testwork and flow sheet design continued during the quarter. As announced in early December 2024 (see press release dated December 4, 2024) testwork has reaffirmed the potential to produce high grade and high purity iron concentrate grading in excess of 67% iron with silica and alumina below 2.3%. Ongoing testwork is focused on flotation testing, more detailed variability tests, grind size and reagent optimization programs as well as equipment sizing.

Current testwork and overall process design are to be at the core of the NI 43-101 Bankable Feasibility Study ("BFS") which is targeted to be completed by the end of Q1 2026. The Bankable Feasibility Study will look to provide greater detail into the potential of the project that was highlighted in the previous 2022 NI 43-101 Preliminary Economic Assessment ("PEA") that delivered a project NPV8% of US$1.6 Billion based upon iron concerates grading 65% iron.

Corporate Activities

The Company has also continued to make progress on improving its working capital position during the quarter with the receipt of a total of US$34 million from asset sales and the sale of an option on the Michelle properties at MDN. As a result, the company has now significantly strengthened its balance sheet and expects to continue to deliver further deleveraging during 2025. Future payments from the Brazilian Monte do Carmo asset sale totalling US$15 million as well as a further US$10 million, should the Michelle Option be exercised, would continue to add to the Company's strong cash position moving forward.

Mark Brennan, CEO and Chairman commented, "While 2024 was a year with significant challenges, we are pleased to have achieved gold production in line with our guidance for the year, supported by strong growth in production from the heap leach as the year progressed. With the new crushing circuit currently being installed, we expect this trend to continue to support production targets for 2025 while we review the potential to add additional production from a potential underground operation at Paloma. Further testwork at our Mont Sorcier project in Quebec continues to highlight the significant upside we see in this project as we work to unlock value with the completion of a feasibility study by Q1/2026. Cerrado is exiting the year with a significantly improved working capital position, placing Cerrado in a stronger financial position heading into 2025. "

Table 1. Key Operating Information

Note : Q1-Q3 2024 Ore mined for Heap Leach Operations has been adjusted to reflect a recalculation based on updated information. This has no impact on ounces produced.

Review of Technical Information

The scientific and technical information from Minera don Nicolas in this press release has been reviewed and approved by Cid Bonfim, P. Geo., Senior Geologist Cerrado Gold, and Pierre Jean LaFleur, P. Geo., VP Exploration for Voyager Metals, a 100% owned subsidiary of Cerrado Gold, are Qualified Persons as defined in National Instrument 43-101.

About Cerrado

Cerrado Gold is a Toronto-based gold production, development, and exploration company focused on gold projects in South America. The Company is the 100% owner of both the producing Minera Don Nicolás and Las Calandrias mine in Santa Cruz province, Argentina. In Canada, Cerrado Gold is developing it's 100% owned Mont Sorcier Iron Ore and Vanadium project located outside of Chibougamou, Quebec.

In Argentina, Cerrado is maximizing asset value at its Minera Don Nicolas operation through continued operational optimization and is growing production through its operations at the Las Calandrias Heap Leach project. An extensive campaign of exploration is ongoing to further unlock potential resources in our highly prospective land package in the heart of the Deseado Masiff.

In Canada, Cerrado holds a 100% interest in the Mont Sorcier Iron Ore and Vanadium project, which has the potential to produce a premium iron ore concentrate over a long mine life at low operating costs and low capital intensity. Furthermore, its high grade and high purity product facilitates the migration of steel producers from blast furnaces to electric arc furnaces, contributing to the decarbonization of the industry and the achievement of SDG goals.

For more information about Cerrado please visit our website at: www.cerradogold.com.

Mark Brennan
CEO and Chairman

Mike McAllister
Vice President, Investor Relations
Tel: +1-647-805-5662
[email protected]

Disclaimer

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

This press release contains statements that constitute "forward-looking information" (collectively, "forward-looking statements") within the meaning of the applicable Canadian securities legislation. All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that discusses predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements.

Forward-looking statements contained in this press release include, without limitation, statements regarding the business and operations of Cerrado, production forecasts and estimated ASIC for 2025 and beyond, the potential for additional crushing capacity that may be added and the performance of the heap leach pad, the possibility of commencing underground mining, the potential to produce iron concentrate grading in excess of 67% at Mont Sorcier, further deleveraging during 2025, receipt of the deferred closing payment of US$15 million in connection with the asset sale and the likelihood of the Michelle option being exercised and the related option payment being received. In making the forward- looking statements contained in this press release, Cerrado has made certain assumptions. Although Cerrado believes that the expectations reflected in forward-looking statements are reasonable, it can give no assurance that the expectations of any forward-looking statements will prove to be correct. Known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking statements. Such factors include, but are not limited to general business, economic, competitive, political and social uncertainties. Accordingly, readers should not place undue reliance on the forward-looking statements and information contained in this press release. Except as required by law, Cerrado disclaims any intention and assumes no obligation to update or revise any forward-looking statements to reflect actual results, whether as a result of new information, future events, changes in assumptions, changes in factors affecting such forward-looking statements or otherwise.

SOURCE: Cerrado Gold Inc.

K.Lam--ThChM