The China Mail - Mawson Finland Begins 2025 Drill Program, Mobilizing Multiple Drill Rigs at Rajapalot

USD -
AED 3.672502
AFN 64.999734
ALL 80.585653
AMD 375.791585
ANG 1.79008
AOA 916.999843
ARS 1442.792198
AUD 1.42778
AWG 1.80125
AZN 1.697294
BAM 1.63073
BBD 1.99759
BDT 121.199993
BGN 1.67937
BHD 0.37703
BIF 2937.878074
BMD 1
BND 1.256097
BOB 6.853798
BRL 5.186502
BSD 0.991791
BTN 90.972914
BWP 13.053901
BYN 2.826126
BYR 19600
BZD 1.994755
CAD 1.358345
CDF 2239.999802
CHF 0.76553
CLF 0.021786
CLP 860.25023
CNY 6.95465
CNH 6.93903
COP 3654.71
CRC 492.76897
CUC 1
CUP 26.5
CVE 91.938449
CZK 20.19675
DJF 176.621406
DKK 6.225285
DOP 62.400727
DZD 129.205871
EGP 47.0508
ERN 15
ETB 154.208339
EUR 0.83368
FJD 2.19835
FKP 0.730141
GBP 0.72429
GEL 2.694983
GGP 0.730141
GHS 10.841008
GIP 0.730141
GMD 72.999809
GNF 8699.603919
GTQ 7.610051
GYD 207.50666
HKD 7.80065
HNL 26.174287
HRK 6.281596
HTG 130.072624
HUF 316.844015
IDR 16708.5
ILS 3.09705
IMP 0.730141
INR 91.6905
IQD 1299.292531
IRR 42125.000158
ISK 121.050414
JEP 0.730141
JMD 155.828021
JOD 0.709033
JPY 152.691031
KES 129.000191
KGS 87.448953
KHR 3988.06
KMF 412.000006
KPW 900.019412
KRW 1423.879653
KWD 0.306479
KYD 0.826534
KZT 499.672738
LAK 21370.831579
LBP 88817.729677
LKR 307.109297
LRD 183.48425
LSL 15.904281
LTL 2.95274
LVL 0.60489
LYD 6.260084
MAD 9.007158
MDL 16.722391
MGA 4452.467409
MKD 51.428905
MMK 2100.049372
MNT 3565.134434
MOP 7.969767
MRU 39.623294
MUR 45.08945
MVR 15.46042
MWK 1735.000582
MXN 17.174502
MYR 3.917502
MZN 63.759723
NAD 15.904348
NGN 1400.660479
NIO 36.497811
NOK 9.59153
NPR 145.555282
NZD 1.65905
OMR 0.38451
PAB 0.9918
PEN 3.324301
PGK 4.243486
PHP 58.722497
PKR 277.687885
PLN 3.500815
PYG 6647.795255
QAR 3.605665
RON 4.249499
RSD 97.881977
RUB 76.251923
RWF 1447.051908
SAR 3.749984
SBD 8.077676
SCR 13.901523
SDG 601.510149
SEK 8.802815
SGD 1.259855
SHP 0.750259
SLE 24.30203
SLL 20969.499267
SOS 565.813555
SRD 38.29699
STD 20697.981008
STN 20.429435
SVC 8.67807
SYP 11059.574895
SZL 15.899644
THB 30.9595
TJS 9.263678
TMT 3.5
TND 2.859918
TOP 2.40776
TRY 43.403503
TTD 6.744515
TWD 31.270504
TZS 2541.724012
UAH 42.574427
UGX 3541.129042
UYU 37.162416
UZS 11999.88327
VES 358.47615
VND 26090
VUV 119.747312
WST 2.729293
XAF 546.933926
XAG 0.00869
XAU 0.00019
XCD 2.70255
XCG 1.787476
XDR 0.68021
XOF 546.929366
XPF 99.437195
YER 238.398647
ZAR 15.84935
ZMK 9001.198985
ZMW 19.583189
ZWL 321.999592
  • SCS

    0.0200

    16.14

    +0.12%

  • RBGPF

    0.0000

    82.4

    0%

  • RYCEF

    0.1500

    17.27

    +0.87%

  • CMSC

    0.0200

    23.8

    +0.08%

  • BP

    0.8600

    37.62

    +2.29%

  • RELX

    -1.1500

    38.36

    -3%

  • NGG

    1.7300

    84.31

    +2.05%

  • GSK

    0.4800

    50.8

    +0.94%

  • RIO

    2.4400

    92.91

    +2.63%

  • BTI

    1.3500

    60.34

    +2.24%

  • BCE

    0.3700

    25.52

    +1.45%

  • CMSD

    -0.0630

    24.097

    -0.26%

  • VOD

    0.2700

    14.5

    +1.86%

  • JRI

    -0.0500

    13.68

    -0.37%

  • BCC

    -1.6600

    81.74

    -2.03%

  • AZN

    1.3700

    95.6

    +1.43%

Mawson Finland Begins 2025 Drill Program, Mobilizing Multiple Drill Rigs at Rajapalot
Mawson Finland Begins 2025 Drill Program, Mobilizing Multiple Drill Rigs at Rajapalot

Mawson Finland Begins 2025 Drill Program, Mobilizing Multiple Drill Rigs at Rajapalot

Mawson Finland Limited ("Mawson" or the "Company") (TSX-V:MFL) is pleased to announce the mobilization of four diamond drill rigs, and a 'base-of-till' (BOT) drilling rig to site, kicking-off the 2025 drill program at the Company's wholly-owned Rajapalot gold-cobalt project in Finland.

Text size:

Highlights:

  • Four diamond drilling rigs mobilized to site this week to drill an estimated 12,000 to 15,000 metres at Rajapalot

  • Substantially all of the program (10,000 to 12,000 metres) is dedicated to drilling for potential extensions and step-outs to the existing inferred resource at Rajapalot in order to augment the current gold-cobalt mineral resource inventory

  • An additional 2,000 to 3,000 metres of diamond drilling is dedicated towards brown-fields 'target-test' exploration on targets presently being developed from EM geophysical surveys, and 'base-of-till' (BOT) geochemical drilling surveys

  • BOT drilling is underway with 500+ holes planned focussing on follow-ups to Ionic-Leach soil anomalies, and geophysical anomalies developed over the Rajapalot property in the previous 2024 exploration season

Ms. Noora Ahola, Mawson Finland CEO, states: "We are very excited to report the commencement of our 2025 winter drilling campaign at Rajapalot. Presently, we have 2 drilling rigs now operating at Rajapalot, with two additional rigs scheduled to begin drilling this week. In addition, we also have a BOT drilling rig up-and-running making progress with our surface geochemical exploration programs around the greater Rajapalot project area. We look forward to presenting results of these drilling programs over the coming months as these exciting works advance and unfold at Rajapalot."

Winter drilling program

Three diamond drill rigs have been mobilized and have initiated drilling at Rajapalot, with one additional rig presently being mobilized to site. Between 12,000 and 15,000 meters of drilling are planned from now (January 2025) through to April 2025, with 10,000 to 12,000 meters of drilling focusing on resource expansion ambitions, while a further 2,000 to 3,000 meters focused on our 'target-test' exploration program.

Resource drilling at Rajapalot will predominantly focus on the Palokas, South Palokas and Raja zones of mineralization, whereby resource extensions and 'step-outs' will follow on from the 2024 drilling seasons results (see Mawson Finland's 2024 drilling summary news release dated November 6,2024), guided by the defined EM conductive bodies identified at depth at Palokas, South Palokas and Raja (as presented in Mawson Finland's news release dated November 19, 2024). Target-test exploration drilling will focus on brownfields targets presently being further developed and defined through BOT geochemical drilling, in conjunction with results from 2024 geophysical surveys (see Mawson Finland's news releases dated November 19, 2024 for DHEM targets, and December 17, 2024 for Ionic Leach soil geochemical anomalies).

A 'base-of-till', or 'BOT' drilling rig has also been mobilized to Rajapalot and begun drilling shallow holes (typically around 5 - 15 meters depth) through the glacial regolith layers to collect a sample from the bedrock-regolith interface. Such drill-sampling of the bedrock-regolith interface has been successfully used for decades in the Nordics to assist in locating the bedrock source of soil and boulder geochemical anomalies found at surface. These short, vertical drill-holes will be spaced between 10 to 20 meters, and arranged along continuous lines in order to transect and collect samples sitting atop buried bedrock in which both geochemical (Ionic Leach soil results) and geophysical (gradient-array IP and resistivity, and ground magnetic) surface detected anomalies exist undercover. Approximately 500+ BOT holes are planned to be drilled and samples over the coming months at Rajapalot. Any highly-anomalous gold- or cobalt-rich BOT samples will be immediately drill-tested in this season's target-test drilling campaign.

Deposit Model

At Rajapalot, mineralization is regarded as orogenic in nature. All examples of gold-cobalt mineralisation are consistently located within highly-sheared and foliated wall-rocks adjacent to strongly hydrothermally altered, northwest to north dipping shear-zones. Mineralisation is typically encountered as disseminated to semi-massive sulfide lenses (predominantly pyrrhotite and lesser pyrite ± cobaltite), hosted within strongly deformed and altered, mafic volcanic and volcaniclasitic stratigraphy of the upper portions of the Paleoproterozoic-aged Kivalo Group of the Peräpohja Greenstone Belt. Prospects with high-grade gold and cobalt mineralisation at Rajapalot occur across a 3 km (east-west) by 2 km (north-south) area within the larger Rajapalot project area measuring 4 km by 4 km with multiple mineralized boulders, base-of-till (BOT). Gold-Cobalt mineralization at Rajapalot has been drilled to approximately 470 metres below surface at both South Palokas and Raja prospects, and mineralisation remains open at depth across the entire project.

Rajapalot Mineral Resource

An Inferred Mineral Resource ("MRE") has been calculated for the Rajapalot project (effective date August 26, 2021), and is based on an 'underground only' mining scenario containing 9.8 million tonnes @ 2.8 g/t gold ("Au") and 441 ppm Co, equating to 867 thousand ounces ("koz") gold and 4,311 tonnes of cobalt.

Zone

Cut-off

(AuEq¹)

Tonnes

(kt)

Au

(g/t)

Co

(ppm)

Au

(koz)

Co

(tonnes)

Palokas

1.1

5,612

2.8

475

501

2,664

Raja

1.1

2,702

3.1

385

271

1,040

East Joki

1.1

299

4.5

363

43

109

Hut

1.1

831

1.3

428

36

355

Rumajärvi

1.1

336

1.4

424

15

142

Total Inferred Resources

9,780

2.8

441

867

4,311

Rajapalot Inferred Mineral Resource Effective August 26, 2021

  • The independent geologist and Qualified Person as defined in NI 43-101 for the mineral resource estimates is Mr. Ove Klavér (EurGeol). The effective date of the MRE remains unchanged to the Previous MRE (August 26, 2021, available on SEDAR as filed by the previous owner, Mawson), and will be restated in the PEA technical report when it is filed.

  • The mineral estimate is reported for a potential underground only scenario. Inferred resources were reported at a cut-off grade of 1.1 g/t (AuEq1 Au g/t + Co ppm /1005) with a depth of 20 meters below the base of solid rock regarded as the near-surface limit of potential mining.

  • Wireframe models were generated using gold and cobalt shells separately. Forty-eight separate gold and cobalt wireframes were constructed in Leapfrog Geo and grade distributions independently estimated using Ordinary Kriging in Leapfrog Edge. A gold top cut of 50 g/t Au was used for the gold domains. A cobalt top cut was not applied.

  • A parent block size of 12 m x 12 m x 4 m (>20% of the drillhole spacing) was determined as suitable. Sub-blocking down to 4 m x 4 m x 0.5 m was used for geologic control on volumes, thinner and moderately dipping wireframes.

  • Rounding of grades and tonnes may introduce apparent errors in averages and contained metals.

  • Drilling results to 20 June 2021.

  • Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

Qualified Person

The technical and scientific information in this news release was reviewed, verified and approved by Dr. Thomas Fromhold, an employee of Fromhold Geoconsult AB, and Member of The Australian Institute of Geosciences (MAIG, Membership No. 8838). Dr. Fromhold is a "qualified person" as defined under NI 43-101. Dr. Fromhold is not considered independent of the Company under NI 43-101 as he is a consultant of the Company.

About Mawson Finland Limited

Mawson Finland Limited is an exploration stage mining development company engaged in the acquisition and exploration of precious and base metal properties in Finland. The Company is primarily focused on gold and cobalt. The Corporation currently holds a 100% interest in the Rajapalot Gold-Cobalt Project located in Finland. The Rajapalot Project represents approximately 5% of the 100-square kilometre Rompas-Rajapalot Property, which is wholly owned by Mawson and consists of 11 granted exploration permits for 10,204 hectares and 2 exploration permit applications and a reservation notification area for a combined total of 40,496 hectares. In Finland, all operations are carried out through the Company's fully owned subsidiary, Mawson Oy. Mawson maintains an active local presence of Finnish staff with close ties to the communities of Rajapalot.

Additional disclosure including the Company's financial statements, technical reports, news releases and other information can be obtained at mawsonfinland.com or on SEDAR+ at www.sedarplus.ca.

Media and Investor Relations Inquiries

Please contact: Neil MacRae Executive Chairman at [email protected] or +1 (778) 999-4653, or Noora Ahola Chief Executive Officer at [email protected] or +358 (505) 213-515.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No securities regulatory authority has reviewed or approved of the contents of this news release.

Forward-looking Information

This news release includes certain "forward-looking information" and "forward-looking statements" within the meaning of applicable securities laws (collectively, "forward-looking information") which are not comprised of historical facts. Forward-looking information includes, without limitation, estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking information may be identified by such terms as "believes", "anticipates", "expects", "estimates", "aims", "may", "could", "would", "will", "must" or "plan". Since forward-looking information is based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, and management of the Company believes them to be reasonable based upon, among other information, the contents of the PEA and the exploration information disclosed in this news release, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to, the Company's objectives, goals or future plans, any expected receipt of additional assay results or other exploration results and the impact upon the Company thereof, any expected milestone independent data verification, the continuance of the Company's quality assurance and quality control program, potential mineralization whether peripheral to the existing Rajapalot resource or elsewhere, any anticipated disclosure of assay or other exploration results and the timing thereof, the estimation of mineral resources, exploration and mine development plans, including drilling, soil sampling, geophysical and geochemical work, any expected search for additional exploration targets and any results of such searches, potential acquisition by the Company of any property, the growth potential of the Rajapalot resource, all values, estimates and expectations drawn from or based upon the PEA, and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to: any change in industry or wider economic conditions which could cause the Company to adjust or cancel entirely its exploration plans, failure to identify mineral resources or any additional exploration targets, failure to convert estimated mineral resources to reserves, any failure to receive the results of completed assays or other exploration work, poor exploration results, the inability to complete a feasibility study which recommends a production decision, the preliminary and uncertain nature of the PEA, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR+. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

SOURCE: Mawson Finland Limited

B.Chan--ThChM